5-4
BE1-50/51B-230/-234 Testing
9252000894 Rev D
Figure 5-2. 50-A Pickup Test Setup
Instantaneous Overcurrent B (50-B) Pickup
1. Connect and configure the relay for 50-B pickup testing:
a. Connect the test setup shown in Figure 5-3.
b. Set circuit board switch SW3 as follows:
SW3-1 = ON for 50 Hz operation or OFF for 60 Hz operation
SW3-2 = OFF (no additional time delay for the 50-A element)
SW3-3 = ON (GE IAC type characteristic curves)
SW3-4 = ON (integrating reset characteristic)
c. Set TIME DIAL to 0.0.
d. Set CURVE to S.
e. Set TIME PICKUP to 15.0.
f.
Set INST PICKUP (50-A) to 90.
g. Set INST PICKUP (50-B) (accessed at the top side of the assembly) to 20 (2.0 Aac).
2. Apply and slowly increase current to terminals 5 and 6 until the 50-B output contacts close. The
applied current should be between 1.935 and 2.065 Aac.
3. Decrease the applied current until the 50-B output contacts open.
4. Set INST PICKUP (50-B) to 80 (8.0 Aac).
5. Slowly increase the current applied to terminals 5 and 6 until the 50-B output contacts close. The
applied current should be between 7.815 and 8.185 Aac.
6. Reduce the applied current to zero.
Summary of Contents for BE1-50B-230
Page 2: ......
Page 6: ...iv BE1 50 51B 230 234 Introduction 9252000894 Rev D This page intentionally left blank...
Page 8: ...vi BE1 50 51B 230 234 Introduction 9252000894 Rev D This page intentionally left blank...
Page 10: ...ii BE1 50 51B 230 234 General Information 9252000894 Rev D This page intentionally left blank...
Page 18: ...1 8 BE1 50 51B 230 234 General Information 9252000894 Rev D This page intentionally left blank...
Page 32: ...ii BE1 50 51B 230 234 Installation 9252000894 Rev D This page intentionally left blank...
Page 38: ...ii BE1 50 51B 230 234 Testing 9252000894 Rev D This page intentionally left blank...
Page 50: ...5 12 BE1 50 51B 230 234 Testing 9252000894 Rev D This page intentionally left blank...