5. Mechanical Installation
5.2.3
Preparation for the assembly mounting
What has to be done ?
Prior to the mounting of the assembly (bottom part of the ceiling mount + VR workroom assembly ), one has to mount the cords on
the pulley systems. The cords and pulley system will be used to pull up the projector.
A safety cable has to be attached to the projector frame and to the ceiling mount.
How to mount the cords on the ceiling mount top parts (has to be done for the 2 ceiling mounts)?
1. Slide the cord support in the support holder on the upper support until it locks (image 5-7, image 5-8)
2. Insert the cord on the upper support as illustrated
3. Run the top of the cord through the hole of the fixation bracket for approx. 1m and fix this latter to the main cord by means of the
3 provided clamps. Tighten the clamp screws very strongly to ensure good fixation and for safety.
Cord
support
Ceiling mount
top part
Image 5-7
clamp
Image 5-8
20
R5976989 BARCO VR WORKROOM 22/09/2006
Summary of Contents for VRWF-3200
Page 6: ......
Page 8: ...Table of contents 2 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 10: ...1 Safety 4 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 12: ...2 Introduction 6 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 16: ...3 Packaging 10 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 20: ...4 System overview 14 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 36: ...6 Fine adjustments 30 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 40: ...7 Connections 34 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 48: ...8 Setup 42 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 62: ...A The support table Image A 6 Image A 7 56 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 66: ...C Troubleshoot 60 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 68: ...Glossary 62 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 70: ...Index 64 R5976989 BARCO VR WORKROOM 22 09 2006...