10. Refrigeration unit
Image 10-24
Plugging the 3 cable connectors
10.Connect the two open type quick couplers of the refrigeration Unit.
Note:
First remove the caps and plugs.
Warning:
Risk of serious liquid spillage: ensure that the clips are correctly & fully engaged after assembly. An audible click
can be heard when the connector is correctly inserted.
Image 10-25
Connecting the quick coupler
11.Insulate the refrigeration Unit quick couplers.
a) Apply contact glue to all mating surfaces of the insulation shells.
b) Allow the glue to dry for 20–40 minutes.
c) Install the insulation shells.
d) Make the insulation airtight using foam tape.
12.Install cable ties (reference 1 image 10-26) to secure the insulation to the refrigeration Unit quick couplers.
1
1
1
1
1
1
Image 10-26
Installing cable ties
64
R5906015 ULC-30A 01/02/2018
Summary of Contents for ULC-30A
Page 1: ...ULC 30A Service manual R5906015 01 01 02 2018...
Page 4: ......
Page 6: ...Table of contents Index 97 2 R5906015 ULC 30A 01 02 2018...
Page 10: ...1 Safety 6 R5906015 ULC 30A 01 02 2018...
Page 24: ...5 Covers 20 R5906015 ULC 30A 01 02 2018...
Page 28: ...6 Fan unit 24 R5906015 ULC 30A 01 02 2018...
Page 40: ...7 Coolant procedures 36 R5906015 ULC 30A 01 02 2018...
Page 70: ...10 Refrigeration unit 66 R5906015 ULC 30A 01 02 2018...
Page 92: ...11 Electronics Unit 88 R5906015 ULC 30A 01 02 2018...