7. Preventive maintenance
7. PREVENTIVE MAINTENANCE
This chapter is intended for trained personnel or expert operators.
Overview
•
•
•
•
7.1
Monthly maintenance
Overview
Description
Comments
Required parts
Check/clean/replace air
fi
lter
Check the air
fi
lter for dust and grease. Clean if necessary. If
not possible due to damage, replace with a new one.
Spare Chiller
fi
lter
7.2
Yearly maintenance
Overview
Description
Comments
Required parts
Check air extraction system
Check booth air extraction system for adequate extraction
Check for InfoT’s
Check if any Info-T have been released that need an
intervention on the ULC-30A.
Check runtime
Check runtime to verify if any runtime-driven interventions are
required.
Check for leaks
Check for liquid leaks in the ULC-30A
Check insulation
Check status of insulation
7.3
3 yearly maintenance
Overview
Description
Comments
Required parts
Flush cooling liquid
Replace the cooling liquid of the system (± 30l)
ULC-30A draining and re
fi
ll tool needed. Includes re
fi
ll tool,
Service SW, cable to connect laptop to chiller.
Cooling liquid 5l
Tooling
7.4
30000 hours maintenance
Overview
Description
Comments
Required parts
Replace Secondary cooling unit
Replace together with Main Pump
DCM-60A secondary
cooling unit
R5905866 ULC-30A 31/01/2018
33
Summary of Contents for ULC-30A
Page 1: ...ULC 30A Installation and user manual R5905866 01 31 01 2018...
Page 4: ......
Page 6: ...Table of contents 2 R5905866 ULC 30A 31 01 2018...
Page 14: ...2 Safety 10 R5905866 ULC 30A 31 01 2018...
Page 36: ...6 Starting up 32 R5905866 ULC 30A 31 01 2018...
Page 44: ...9 Basic replacements 40 R5905866 ULC 30A 31 01 2018...
Page 50: ...11 Environmental information 46 R5905866 ULC 30A 31 01 2018...