4. Installation
HUB
LAN
Image 4-39
Network connection through a HUB
See
Network settings
to set the communication port.
4.7.3.2
Network settings
C
AUTION
:
Make sure that a DHCP server is available in the network and works
fi
ne.
In normal conditions, the network detection takes few seconds. This means that the total time needed to go
from power ON to Standby mode is only a few seconds. This value can vary depending on the speed of the
network connection.
But when the DHCP setting of the projector is set to Yes and the network does not allow the projector to obtain
an IP address from the DHCP server, the startup time will be delayed by upto
fi
ve minutes. After this time, a
time-out occurs if the network detection fails, and the projector starts up without any network connection.
What can be done?
These settings are used to set the Ethernet Communication parameters.
Following parameters are available :
MAC Address
MAC Address of the projector (This is a non-adjustable value programmed into the Ethernet
board).
IP Address (Current)
IP Address of the projector (This is a non-adjustable value).
Subnet Mask
Subnet Mask (This is a non-adjustable value)
Gateway
Gateway (This is a non-adjustable value)
DHCP
DHCP setting:
•
Yes
: The projector will dynamically obtain its IP address from the DHCP server.
•
No
: The IP address needs to be entered manually. Note that when selecting
Fixed IP
the IP settings
fi
elds are enabled
IP Address
Fixed IP Address of the projector : this
fi
eld can be edited when Fixed IP is selected
Subnet Mask
Subnet Mask : this
fi
eld can be edited when Fixed IP is selected
Gateway
Gateway : this
fi
eld can be edited when Fixed IP is selected
Hostname
Hostname : this
fi
eld can be edited when DHCP is selected
How to set up the network settings ?
1. Press the
MENU
key to activate the Menu bar.
R59770330 SIM 7QP SERIES 08/12/2014
31
Summary of Contents for SIM 7QP HB
Page 8: ...Table of contents 4 R59770330 SIM 7QP SERIES 08 12 2014...
Page 12: ...1 Introduction 8 R59770330 SIM 7QP SERIES 08 12 2014...
Page 38: ...4 Installation 34 R59770330 SIM 7QP SERIES 08 12 2014...
Page 52: ...5 Setup 48 R59770330 SIM 7QP SERIES 08 12 2014...
Page 82: ...7 Advanced Image 7 50 Image 7 51 Image 7 52 78 R59770330 SIM 7QP SERIES 08 12 2014...
Page 139: ...7 Advanced Image 7 157 R59770330 SIM 7QP SERIES 08 12 2014 135...
Page 168: ...7 Advanced 164 R59770330 SIM 7QP SERIES 08 12 2014...
Page 182: ...8 Maintenance 178 R59770330 SIM 7QP SERIES 08 12 2014...
Page 188: ...10 Environmental information 184 R59770330 SIM 7QP SERIES 08 12 2014...
Page 194: ...C GLD alignment 190 R59770330 SIM 7QP SERIES 08 12 2014...
Page 198: ...D Image files 194 R59770330 SIM 7QP SERIES 08 12 2014...
Page 200: ...Glossary 196 R59770330 SIM 7QP SERIES 08 12 2014...
Page 204: ...Index 200 R59770330 SIM 7QP SERIES 08 12 2014...