![background image](http://html1.mh-extra.com/html/barco/sim-7qp-hb/sim-7qp-hb_user-manual_4252429190.webp)
A. NVG option (for SIM 7QP)
1.
First phase (TOD value is increased from 100 on):
CCD
is moving to higher transmission until is has reached full transmission
2.
Second phase (TOD value is increased until 1000):
ECR
is moving to full transmission
3.
Third phase (TOD is set to 1001):
-
NVG
fi
lter
moves out of the light path
-
ECR returns to its minimum, being 40%
-
CCD returns to the position that meets the TOD setting of 1001
-
CLO-TOD tracking Dynacolor set is enabled
4.
Fourth phase (TOD value is further increased):
CCD
is moving to higher transmission until is has reached full transmission
5.
Fifth phase (TOD value is further increased to 10000):
ECR
is moving to full transmission
186
R59770330 SIM 7QP SERIES 08/12/2014
Summary of Contents for SIM 7QP HB
Page 8: ...Table of contents 4 R59770330 SIM 7QP SERIES 08 12 2014...
Page 12: ...1 Introduction 8 R59770330 SIM 7QP SERIES 08 12 2014...
Page 38: ...4 Installation 34 R59770330 SIM 7QP SERIES 08 12 2014...
Page 52: ...5 Setup 48 R59770330 SIM 7QP SERIES 08 12 2014...
Page 82: ...7 Advanced Image 7 50 Image 7 51 Image 7 52 78 R59770330 SIM 7QP SERIES 08 12 2014...
Page 139: ...7 Advanced Image 7 157 R59770330 SIM 7QP SERIES 08 12 2014 135...
Page 168: ...7 Advanced 164 R59770330 SIM 7QP SERIES 08 12 2014...
Page 182: ...8 Maintenance 178 R59770330 SIM 7QP SERIES 08 12 2014...
Page 188: ...10 Environmental information 184 R59770330 SIM 7QP SERIES 08 12 2014...
Page 194: ...C GLD alignment 190 R59770330 SIM 7QP SERIES 08 12 2014...
Page 198: ...D Image files 194 R59770330 SIM 7QP SERIES 08 12 2014...
Page 200: ...Glossary 196 R59770330 SIM 7QP SERIES 08 12 2014...
Page 204: ...Index 200 R59770330 SIM 7QP SERIES 08 12 2014...