background image

5. Network setup 

5.1

 

Test Green BCM Box  

Make sure that the mains cable is connected, and connect the Green BCM Box to the mains.  
Switch on Green BCM Box by one of the following controls: LAN; IR; push button. 

 

 

 

 

In case none of the controls is available, 
push the RESET button: This will reboot the 
box!  

En cas aucun des contrôles est disponible, 
appuyez sur le bouton RESET: Ce redémarre 
la boîte! 

 

 

 

When Green BCM Box is up and running, the green power LED is on.  
Each time Green BCM Box switches on, the processor will initially test the basic functions (POST). Finally, the 
processor will boot the operating system from the hard disk and start Barco Wall Control Manager service. 
The Barco Wall Control Manager client application can be downloaded from the homepage of the Green BCM 
BOX. Please refer to the user manual of Barco Wall Control Manager software. 

5.2

 

Switching off Green BCM Box, Stand-by Mode  

Switch off Green BCM Box by one of the following controls: LAN; IR; Green ONOFF Buton. 
If shut down, Green BCM Box will switch off automatically thereby changing to the standby mode in which all 
components of intensive performance are shut down completely.  
Switch On Green BCM Box again by one of the following controls: button SwitchON on the web site; IR Remote 
Control; Green ONOFF button. The processor will start up again. The green power LED will once again light up 
continuously.  

 

 

 

 

Please note that the Green ONOFF button 
requires to be pushed several seconds 
before the system starts up / goes to 
standby. This behavior is by default to 
prevent switching the wall on and off by 
accident. So keep in mind that short pushes 
are ignored! 

Se il vous plaît noter que le bouton vert 
ONOFF nécessite d'être poussé plusieurs 
secondes avant que le système démarre / 
se met en veille. Ce comportement est par 
défaut pour éviter la mise sous tension et 
hors du mur par accident. Donc, gardez à 
l'esprit que pressions courtes sont 
ignorées! 

 

 

 

 

 

 

 

 

When switched to standby, the BCM wall 
service is also stopped. It is only a small 
controller in the control unit which stays 
alive and which allows accessing the BCM 
via its IP address. When accessed, a web site 
is launched with a button to switch on the 
entire system. 
Please note: after clicking the SwitchOn 
button, it takes several minutes until all 
displays are running again. 
In case you clicked the SwitchOn button by 
mistake, cancel the command by clicking 
SwitchOff. 

En position de veille, le service de la paroi 
BCM est également arrêté. Ce est 
seulement un petit contrôleur dans l'unité 
de commande qui reste en vie et qui 
permet d'accéder à la BCM via son adresse 
IP. Lorsque l'on accède, un site web est 
lancé avec un bouton pour passer sur 
l'ensemble du système. 
 Se il vous plaît noter: après avoir cliqué 
sur le bouton SwitchOn, il faut plusieurs 
minutes jusqu'à ce que tous les affichages 
sont à nouveau en cours d'exécution. 
 Dans le cas où vous avez cliqué sur le 
bouton SwitchOn par erreur, annulez la 
commande en cliquant déconnexion. 

 

 

 

Green BCM Box can be completely disconnected form the power supply by pulling the mains plug. The green 
power LED will extinguish completely within a few seconds.  

Barco – Green BCM Solution – R591346 – user's manual – Revision 04– November-2016

 ____________________________________________________________________ 

 39 

Summary of Contents for R591346

Page 1: ...User s manual GREEN BCM SOLUTION R591346...

Page 2: ...le GREEN BCM SOLUTION User s Manual ID no R591346 Revision 04 Date November 2016 Barco Green BCM Solution R591346 user s manual Revision 04 November 2016_______________________________________________...

Page 3: ...sdr cklich zugestanden ist Urheberrechte insbesondere auch solche an Software werden nur insoweit bertragen als es f r die Erreichung des speziellen Vertragszwecks erforderlich ist Zuwiderhandlungen k...

Page 4: ...prior to acceptance any act or negligence of customer or any third party or any phenomena inherent to the technology used such as image retention burn in vibrations etc The warranty is void if serial...

Page 5: ...6201 298 E mail docu de bcd barco com Web www barcocontrolrooms com From Date Please correct the following points in this documentation R591346 page wrong correct Barco Green BCM Solution R591346 use...

Page 6: ...le 19inch 23 3 4 1 Position and function of controls 24 3 5 Green ONOFF Button 25 4 Installation 27 4 1 Installing Green BCM Box and the Green Power Switches AC power supply 27 4 1 1 Control cabling 2...

Page 7: ...7 5 1 HDMI Type A 46 7 5 2 USB connector 47 7 5 3 RJ25 connector 47 7 5 4 RJ45 connector 48 7 5 5 10 00mm Pitch Mini fit Header 48 7 6 Module configurations 49 7 6 1 Distribution of power bricks disp...

Page 8: ......

Page 9: ...Green BCM Solution The Green BCM Solution comprises the following functional components Green BCM Box mandatory Green Power Switch optional requires displays with AC power module Green On Off button...

Page 10: ...arge Le non respect des instructions symbolis es par ce pictogramme entra nera un risque de dommage de pi ces sensibles la charge lectrostatique If you do not heed instructions indicated by this symbo...

Page 11: ...lectromagnetic Interference Green BCM Solution complies with the following EMC standards Electromagnetic compatibility emission EN 55022 2010 AC 2011 EN 61000 3 2 2006 A1 2009 A2 2009 EN 61000 3 3 200...

Page 12: ...e carried out by unauthorized personnel Never open the case of the unit without first disconnecting the power supply cord To prevent fire or electrical shock hazard do not expose this unit to rain or...

Page 13: ...tself If an extension cord is used with this product make sure that the total of the ampere ratings on the products plugged into the extension cord does not exceed the extension cord ampere rating Nev...

Page 14: ...t itself 1 2 7 Certifications Green BCM Box See the product label for additional approval marks 1 2 8 Servicing Mechanical or electrical modifications others than described in this manual must not be...

Page 15: ...ection point for the recycling of waste electrical and electronic equipment To pre vent possible harm to the environment or human health from uncontrolled waste disposal please separate these items fr...

Page 16: ......

Page 17: ...ing each device using the wall internal Ethernet interface The Green BCM Solution comprises the following functional components Green BCM Box mandatory Power Box 19inch optional requires displays with...

Page 18: ......

Page 19: ...en power switch is always looking for a zero crossing on the phase of the power net If no power net is connected the Green Power Switch will not switch to on mode In standby mode all displays of an OV...

Page 20: ...perated via LAN and controls the displays also via LAN Therefore the LAN interfaces Wall and Client are required for operating Green BCM Box as wall router Interfaces USB1 USB2 HDMI The device does no...

Page 21: ...er will be consumed 3 2 1 Position and function of the control elements on the front POWER IN POWER OUT The Green Power Switch is the main switch of the displays with AC power supply The displays are...

Page 22: ...g for a zero crossing on the phase of the power net If no power net is connected the Green Power Switch will not switch to on mode L interrupteur d alimentation vert est toujours la recherche d un pas...

Page 23: ...lso 1U in height One Power Module can be equipped with up to 4 SMPS power supplies Bricks AC DC converter The SMPS power supply is available as 800W version or as 1200W version The SMPS power supplies...

Page 24: ...ts or short out parts that could result in a risk of fire or electrical shock 3 4 1 Position and function of controls PGM interface This interface is used for servicing only DC connectors The back pla...

Page 25: ...switch the entire display wall to standby into operation When switching to standby the displays are actually switched off for zero energy consumption The Green ONOFF Button shows the status of a displ...

Page 26: ......

Page 27: ...e limit is not exceeded Please make sure that there is sufficient room for the connections and that there are no protruding sharp edges Such edges could damage the connection cables which in turn woul...

Page 28: ...Switch Box from the AC IN interface If a display is in operating mode switching off the power switch will switch off the display If a display is in Standby mode Sleeping mode switching the power swit...

Page 29: ...ch Box The AC IN of the Green Power Switch Box is connected to the wall outlet 4 1 3 Switching on The green power switch is always looking for a zero crossing on the phase of the power net If no power...

Page 30: ...n height thus a Power Module actually makes up 2U The Green 19 inch ONOFF cover completes the Power Module 19inch with the Green ONOFF button and the in stallation facility for the Green BCM Box the G...

Page 31: ...r supply fix the respec tive screw SMPS power supply 800W SMPS power supply 1200W Please note Once plugged into the Power Module 19inch the SMPS power bricks are locked and need to be unlocked before...

Page 32: ...ule 19inch is connected to the CONTROL IN interface of the following Power Module 19inch Always connect the CONTROL OUT interface of the previous Power Module 19inch to the CONTROL IN interface of the...

Page 33: ...splay You do not need to switch to a different exit even in case one of the SMPS power bricks fails As long as the remaining amount of power is sufficient all displays are powered Jusqu quatre blocs d...

Page 34: ...cordement des lignes lectriques sur les bornes de connexion de la 19inch Power Module C bles doivent tre s lectionn s selon les puissances figurant sur l tiquette du produit de la 19inch Power Module...

Page 35: ...designed for occasional flexible use and fixed installation subject to normal mechanical load conditions They are suitable for non continuously recurring movement without tensile load Continuous oper...

Page 36: ...switched off Use the Green ONOFF button of the 19inch rack to switch off the wall or use the command Standby on the web interface of the Green BCM Box Please note that switching a panel to idle push b...

Page 37: ...matically gets a short term IP address A PC connected to the DHCP server i e the network cable is plugged into one of the LAN switches of the video wall can connect to and launch the Green BCM Box web...

Page 38: ...e the displays Green BCM Box and the operator workstation are an independent network no more interac tion is required Make sure to use cables with shielding of type S FTP or S STP Assurez vous d utili...

Page 39: ...o prevent switching the wall on and off by accident So keep in mind that short pushes are ignored Se il vous pla t noter que le bouton vert ONOFF n cessite d tre pouss plusieurs secondes avant que le...

Page 40: ......

Page 41: ...19inch Replacing the fuse is explained in the service manual and needs to be done by authorized service personal Remplacement du fusible est expliqu dans le manuel de service et doit tre fait par du p...

Page 42: ...dule Ne pas utiliser d autres unit s de puissance The SMPS power units are locked and need to be unlocked prior replacement SMPS power supply 800W SMPS power supply 1200W Unlock the screw push the las...

Page 43: ...rt the USB stick in USB2 slot USB1 slot cannot be used for booting from USB Wait for 20 seconds Plug in the power cable After few seconds LED in Green Box starts flashing faster 2 Hz The upgrade syste...

Page 44: ...out power you need to wait for approx 20 seconds before plugging it again Insert the USB stick in your PC or Laptop computer navigate to log and check gbcm upgrade log for error messages Your upgrade...

Page 45: ...MX6 Cortex A9 processor based EDX extension board 7 2 Green Power Switch Width of Casing 57 6mm 2 27in Height 126mm 4 96in Depth 80 5mm 3 16in Power Rating 100 240V AC 5A 50 60Hz Mains Adapter IEC App...

Page 46: ...s Operating conditions Temperature 10 C to 45 C Humidity 20 to 80 non condensing up to 40 C Transportation storage Temperature 20 C to 50 C Humidity 5 to 90 non condensing 7 5 Interfaces 7 5 1 HDMI Ty...

Page 47: ...8 TMDS Data 0 Shield 18 5 V Power 9 TMDS Data 0 19 Hot Plug Detect 10 TMDS Clock 7 5 2 USB connector 1 5V power 2 Differential Data line 3 Differential Data line 4 GND 7 5 3 RJ25 connector Barco Gree...

Page 48: ...ecifications 7 5 4 RJ45 connector 7 5 5 10 00mm Pitch Mini fit Header Barco Green BCM Solution R591346 user s manual Revision 04 November 2016__________________________________________________________...

Page 49: ...3 5 6 50 m 1 3 5 6 2 5 6 100 m 1 3 5 6 2 5 6 Short explanation With power net 100 110V the 1200 W power brick is not allowed red The max number of displays green depends on the cable length in case of...

Page 50: ...SAME amount of displays Or There are n1 power modules 19 connected to m1 displays and n2 power modules 19 connected to m2 m1 1 displays Example Display wall of 16 displays residual power 110V power br...

Page 51: ...rijk BE0473191041 Visit Barco at http www barco com For Professional Support visit http www barco com support For Sales or other Contact information visit http www barco com contact regional offices B...

Page 52: ......

Page 53: ...s successfully been tested to be in accordance with See product ID label for additional approval marks Barco Green BCM Solution R591346 user s manual Revision 04 November 2016_________________________...

Page 54: ......

Page 55: ...le is prepared in accordance with the provisions of SJ T 11364 O GB T 26572 O Indicates that this hazardous substance contained in all of the homogeneous materials for this part is below the limit req...

Reviews: