7. Basic setup procedures
7.10 Join two ILite truss beams together
First attach one row of ILite rental tiles with the ILite truss beams before joining ILite truss beams together.
Necessary tools
10 mm Allen key.
How to join two truss beams together ?
1. Open the side locking mechanism of the truss beam, which you want to join. Use a 10 mm Allen key.
Image 7-38
2. Open the side locking mechanism of the rental tile at the to adjoin side of the truss beam.
Image 7-39
3. Carefully bring the truss beams together. The positioning pins and holes, of the adjoining side, must fit into each other.
Caution:
Ensure that both truss beams, with tiles, are lifted at the same height.
Image 7-40
4. Close the side locking mechanism of the truss beam. Use a 10 mm Allen key.
60
R5976189 ILITE RENTAL DISPLAY 16/09/2005
Summary of Contents for ILite
Page 1: ...ILite rental display Installation manual R5976189 04 16 09 2005...
Page 4: ......
Page 12: ...1 Safety 8 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Page 16: ...2 Installation requirements 12 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Page 34: ...5 ILite rental peripherals and accessories 30 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Page 40: ...6 Setup process of an ILite rental display 36 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Page 70: ...7 Basic setup procedures 66 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Page 76: ...8 Cabling of an ILite display 72 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Page 90: ...10 Servicing 86 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Page 106: ...B Specifications 102 R5976189 ILITE RENTAL DISPLAY 16 09 2005...