10. Put ceramic logs no. 36, 44, 46 and 47 on the fire glass as shown on the picture.
Figure 38.
11. Install the glass panes. Refer to chapter
for the correct procedure.
5.3.4
Do a final check on the fireplace
Safety conditions
Caution:
Wait 4 weeks after the installation before you use the fireplace. The cement
needs to harden. A final check on the fireplace can be done directly after the
installation.
Procedure
1.
Start the appliance and do a check on the ignition of the pilot light and main burner.
The ignition must be quiet and must produce a calm flame. To start the appliance,
refer to the user manual.
2.
Do a check on the main burner. The flames increase in height and change from blue/
yellow to yellow.
3.
If all flames are yellow, the appliance is ready for use.
Installation
50
Gas Fire Front 90-75
Summary of Contents for 90-75 PF2
Page 60: ...3 Slide the strip downwards 4 Tighten the nut wings Maintenance 60 Gas Fire Front 90 75...
Page 78: ...9 9 BARBAS Airbox 160 with 4 insert models Dimensions 78 Gas Fire Front 90 75...
Page 79: ...9 10 BARBAS Airbox 320 with 4 insert models Dimensions Gas Fire Front 90 75 79...
Page 82: ...11 EU Declaration of Conformity EU Declaration of Conformity 82 Gas Fire Front 90 75...
Page 83: ...EU Declaration of Conformity Gas Fire Front 90 75 83...
Page 84: ...Your Barbas dealer 002 21 07 2022 352044 242 002...