P/N 128185
Banner Engineering Corp.
•
Minneapolis, MN U.S.A.
www.bannerengineering.com • Tel: 763.544.3164
DX80 Quick Start Guide
7
GETTING STARTED – SITE SURVEY
Remove Gateway rotary switch access cover.
Change right rotary switch setting to 1
The Gateway is enabled to read the status
of Node 1 and the display will now scroll
through the Node’s I/O status
Single-click Gateway push button 1
Device Information menu
Single-click Gateway push button 1
Factory Settings menu
Single-click Gateway push button 1
Site Survey menu
Single-click Gateway push button 2
Site Survey will be conducted with Node 1
Single-click Gateway push button 2
Examine reception readings (M,R,Y,G) of the Gateway
at various locations
Double-click Gateway push button 2
End Site Survey
Change right rotary switch back to 0 (Gateway)
Change the device readings back to the
Gateway
Double-click Gateway push button 2
Move back to the top level menu
Single-click Gateway push button 1
Return to RUN mode
Single-click Gateway push button 1
Single-click Gateway push button 1
Install Gateway rotary switch access cover.
A site survey determines the quality of the link between a Gateway and a given Node. The
Gateway
is used to perform a site survey.
NOTE: The Site Survey should be performed prior to the permanent installation of your network to ensure robust communication.
SITE
SURVEY
MENU
SURVEY
READINGS
RETURN
TO
RUN
MODE
User Action
Display/Status
The Gateway analyzes the quality of signal
from the Node by counting the number of
data packets it receives from the Node.
M = Missed packet
R = RED marginal signal,
Y = YELLOW good signal,
G = GREEN excellent signal
Install devices in positions that optimize
the number of YELLOW and GREEN data
packets received.
Notes
Quick Start:
STEP 5
> Site Survey (optional)