BA24
43
UK
PHOTOCELL 1
E1
Description
Menu
Function
Status
Y
N
Photocell 1 enabled
Photocell 1 disabled
PHOTOCELL 2
E2
Y
N
Photocell 2 enabled
Photocell 2 disabled
EDGE (SEFETY DEVICE)
E3
Y
N
Edge enabled
Edge disabled
TIMES MANAGEMENT
T3 ADDITIONAL TIME
Additional time at the end of the working time (with full force or during deceleration phase according to the
settings) that allows to continue the movement to close the leaf even if there is wind.
The T3 function is not active with the sliding configuration.
During the T3 time, the anti-crushing is not active, so the T3 time must start as near as possible next to the door
stroke.
In case of utilisation of double limit switch it's advisable that the second one is not exceeded to maintain the
control in case of change of direction.
TIME PROGRAMMING PROCEDURE
CAUTION:
start with the gate completely closed.
The times are programmed by means of successive START pulses.
To enter this procedure select the menu C21. (menu C21 blinking)
By pressing OK, the times programming procedure starts (menu C21 Y fixed) then:
1 motor configuration
• START the leaf starts opening.
• When the leaf arrives at the desired opening position START the leaf stops.
• Counting of the pause time.
• When the desired pause time has elapsed START the leaf starts closing.
• When the leaf arrives at the closing position START the leaf stops.
• At this point the procedure has finished, the blinking menu C21 (without Y) reappears.
• If you want to repeat the operation press OK.
• If you want to finish the operation of times learning saving the data, key ESC as long as the horizontal lines and
Gbd inscription do not appear on the display.
2 motors configuration
• START the leaf 1 starts opening.
• After the desired opening phase shift time START the leaf 2 starts opening.
• When the leaf 1 arrives at the desired opening position START the leaf 1 stops.
• When the leaf 2 arrives at the desired opening position START the leaf 2 stops.
• Counting of the pause time.
• When the desired pause time has elapsed START the leaf 2 starts closing.
• After the desired closing phase shift time START the leaf 1 starts closing.