3 Preparation
Carefully unpack the air circulation dryer and accessories and inspect them for
completeness or possible transportation damages. Any identi
fi
ed damage or defects
must be communicated immediately and in writing to the transportation company and
to the supplier.
Before startup, the air circulation dryer should stand for 2 hours at its operating location
so that it can adjust to the ambient conditions.
3.1
Scope of delivery
1 Air circulation dryer, see delivery note
1 Shelf
1 Operating
manual
1 Declaration of conformity
Additional accessories as ordered – see delivery note
3.2
Setup / assembly
Installation must be performed on solid ground. The installation surface should be level
and horizontal. When setting the device up on the tank rack, make sure that the device
feet are positioned in the designated footprints; in the process
- Pay attention to the maximum weight, including items to be dried.
For net weight, see the technical data (chapter 2.4).
- Do not obstruct the air supply below the air circulation dryer.
Set-up
Fully remove transportation aids (pallets, transport safety devices).
Set up the air circulation dryer in a dry room.
Place a drip tray (provided on site) under the outlet, or connect the outlet to a drain
using a hose.
When setting up, minimum distances on all sides must be observed: 15 cm.
The intake openings of the fans on the underside, and the ventilation slots on
the outside of the dryer may not be covered, as this would hinder cooling inside
the device.