54
Auger Grease Bank
Assembly
Required Hardware
Required Tools / Equipment
(2) 1/4” X 3/4” Bolt P# 1162
Wrenches
Wire Cutter
Figure 119
Figure 121
Remove bolts P# 1162 and remove cover P# 41704. Install grease tab P# 72335 using bolts P# 1162 and
locknuts P# 2564. See Figure 119. Replace cover P# 41704 and replace bolts P# 1162 . Install decal P#
72354. See figure 120. All grease lines are connected to the grease tabs using a grease zerk P# 2291 and
fitting P# 12333. See Figure 119. We show some individual hose installations from this common routing
point to where they attach to the grease point. See Figure 121.
Figure 120