
34
Lower Vertical Auger Chain Continued
Assembly
Required Hardware
Required Tools / Equipment
Double Chain Link P# 90926
Needle Nose Pliers
Pipe Wrench
Disassemble double chain connector link P# 90926. Bring both chain ends together at small sprocket.
Insert double chain connector link to connect the two ends of the chain. Insert two center pieces of
double chain connector link and then outer piece. Insert two cotter pins and bend so they will not catch
on anything. See Figure 5.
Figure 5
P# 90926
P# 90926
Summary of Contents for Field Floater
Page 1: ...Assembly Instructions July 2012 ...
Page 53: ...53 Hydraulics Continued Assembly Figure 2 ...
Page 68: ...68 Pre Startup Continued Lubrication ...
Page 69: ...69 Pre Startup Continued Lubrication ...
Page 70: ...70 Pre Startup Continued Lubrication ...
Page 73: ...73 Notes ...
Page 74: ...74 Notes ...