
26
Lower Vertical Auger Continued
Assembly
Required Hardware
Required Tools / Equipment
(4) 3/4” X 3” Bolt P# 1315
(4) 3/4” Locknut P# 2593
(8) 3/4” Washer P# 1603
Crane
Lifting Tackle
Center Punch
Wrenches
Insert bolts P# 1315, washers P# 1603 on bolts and before lock nuts P# 2593. Tighten after securing
bolts and lock nuts around flange. See Figures 1 and 2.
P# 2593
P# 1603
P# 1315
P# 1603
Summary of Contents for Field Floater
Page 1: ...Assembly Instructions July 2012 ...
Page 53: ...53 Hydraulics Continued Assembly Figure 2 ...
Page 68: ...68 Pre Startup Continued Lubrication ...
Page 69: ...69 Pre Startup Continued Lubrication ...
Page 70: ...70 Pre Startup Continued Lubrication ...
Page 73: ...73 Notes ...
Page 74: ...74 Notes ...