
50
Wiring Harness Continued
Assembly
Required Hardware
Required Tools / Equipment
N/A
Route work light connections from wiring harness P#72852 under and around horizontal auger and up to
work light locations. Connect work light installed on upper auger. Leave wire for light mounted on
extensions until they are installed. See Figures 2 and 3. See Figure 6 for specific wire locations.
P# 845001
Tie Wraps
Wire Cutters
Figure 4
Figure 5
Summary of Contents for Field Floater
Page 1: ...Assembly Instructions July 2012 ...
Page 53: ...53 Hydraulics Continued Assembly Figure 2 ...
Page 68: ...68 Pre Startup Continued Lubrication ...
Page 69: ...69 Pre Startup Continued Lubrication ...
Page 70: ...70 Pre Startup Continued Lubrication ...
Page 73: ...73 Notes ...
Page 74: ...74 Notes ...