1 / 18
0006081362_200806
E
N
G
L
I
S
H
- Before using the burner for the first time please carefully read the chapter “WARNINGS NOTES FOR THE USER : HOW TO
USE THE BURNER SAFELY” in this instruction manual, which is an integral and essential part of the product. The works
on the burner and on the esystem have to be carried out only by competent people.
- Read carefully the instructions before starting the burner and service it.
- The system electric feeding must be disconnected before starting working on it.
- If the works are not carried out correctly it is possible to cause dangerous accidents.
Statement of Conformity
We hereby declare under our own responsibility, that our “CE” marked products Series:
Sparkgas…; BTG…; BGN…; Minicomist…; Comist…; RiNOx…, BT…; BTL…;
GI…; GI…Mist; PYR…; TS…, TBG...,
Description:
domestic and industrial blown air burners fired by gas, oil and dual fuel respect the
minimal regulation of the European Directives:
• 90/396/EEC (G.A.D)
• 92/42/EEC (B.E.D)
• 89/336/EEC (E.M.C. Directive)
• 73/23/EEC (Low Voltage Directive)
• 98/37 EEC (Machinery Directive)
and have been designed and tested in accordance with the European Standards:
• EN 676 (gas and dual fuel, gas side)
• EN 267 (light oil and dual fuel, oil side)
• EN 60335-1, 2003
• EN 50165: 1997 + A1:2001
• EN 55014 -1
(1994)
and –2
(1997)
Surveillance accordingly Gas Appliances Directive 90/396/EEC made by:
CE0085 - DVGW
INDEX
................................................................................................................................................. PAGE
-
Warning notes for the user.................................................................................................................“
2
- Technical specifications
......................................................................................................................“
4
-
Application of the burner to boiler - Assembling the gas train ..........................................................“
8
-
Wiring diagram ...................................................................................................................................“
9
-
Descriptions of operations .................................................................................................................“
10
-
Gas burner control devices ................................................................................................................“
11
-
Methane gas ignition and adjustment ................................................................................................“
12
-
Ionisation current adjustment.............................................................................................................“
13
-
Electrodes/ ionisation probe adjustment - Combustion head air adjustment .....................................“
16
-
Servomotor cam regulation................................................................................................................“
15
-
Maintenance.......................................................................................................................................“
16
- Preparation for connection with train turned upward - Two stage gas-fired burners - Single stage
air burner adjustment scheme............................................................................................................“
17
-
Problem - Cause - Solution................................................................................................................“
18
-
Electric diagram .................................................................................................................................“ 93
The Vice President and Managing Director:
Dr. Riccardo Fava