![baltur TBG 2000 ME Installation, Use And Maintenance Instruction Manual Download Page 40](http://html1.mh-extra.com/html/baltur/tbg-2000-me/tbg-2000-me_installation-use-and-maintenance-instruction-manual_4149800040.webp)
ENGLISH
12 / 26
0006160227_201702
ASSEMBLING THE GAS TRAIN
The EN 676 approved gas train is sold separately from the burner.
The burner is supplied by the gas train connection facing
downward.
The gas train can be assembled in different ways: -11, -12
Choose the most rational position for the set-up of the boiler room
and the position in which the gas pipeline arrives.
GAS TRAIN PRINCIPLE DIAGRAM
The basic diagram of the gas supply line is shown in the figure
below.
DANGER / CAUTION
Install a manual on/off valve upstream of the gas valve
according to the layout shown in the diagram illustrating the
gas train principle.
GAS SUPPLY LINE
RESPONSIBILITY OF THE INSTALLER
LIMITS ON BALTUR SUPPLY
1
Air regulation servomotor
2
Air pressure switch
3
Maximum gas pressure switch
4
Gas supply control butterfly valve
5
Operating gas valve with pressure regulator
6
Valve tightness control device (integrated in the apparatus)
7
Safety valve
8
Minimum gas pressure switch and gas leak control
9
Gas filter
10
Air vibration-proof joint (not supplied)
11
Manual shut-off valve (not supplied)
12
Gas regulation servomotor
Summary of Contents for TBG 2000 ME
Page 2: ......
Page 24: ...ITALIANO 22 26 0006160227_201702 SCHEMI ELETTRICI TBG 480 2000 ME ...
Page 25: ...ITALIANO 23 26 0006160227_201702 TBG 480 2000 ME ...
Page 26: ...ITALIANO 24 26 0006160227_201702 TBG 480 2000 ME ...
Page 27: ...ITALIANO 25 26 0006160227_201702 TBG 480 2000 ME ...
Page 50: ...ENGLISH 22 26 0006160227_201702 WIRING DIAGRAMS TBG 480 2000 ME ...
Page 51: ...ENGLISH 23 26 0006160227_201702 TBG 480 2000 ME ...
Page 52: ...ENGLISH 24 26 0006160227_201702 TBG 480 2000 ME ...
Page 53: ...ENGLISH 25 26 0006160227_201702 TBG 480 2000 ME ...
Page 55: ......