MAINTENANCE
Analyse combustion gases and check that the emission values are
correct at least once a year, in compliance with current law.
•
Clean air dampers, the air pressure switch with pressure port and
the relevant pipe, if any.
•
Check the electrode condition. Replace them, if necessary.
•
Clean the photocell. Replace it, if necessary.
•
Have the burner and the chimney cleaned by specialised personnel
(stove repairer); a clean burner is more efficient, lasts longer and is
quieter.
•
Check that the fuel filter is clean. Replace it, if necessary.
•
Check that all components of the combustion head are in good
condition, have not been deformed and are free from impurities
or deposits deriving from the installation environment and/or from
combustion.
•
Analyse combustion gases and check emissions values.
MAINTENANCE TIME
Part description
Action to be performed
Gas
COMBUSTION HEAD
EXTERNAL DIFFUSER
VISUAL CHECK OF THE CONDITION
YEAR
ELECTRODES
VISUAL INSPECTION OF THE INTEGRITY OF CERAMICS. TIP GRINDING, CHECK DISTANCE, CHECK
ELECTRICAL CONNECTION
YEAR
FLAME DISC
INTEGRITY VISUAL CHECK FOR ANY DEFORMATIONS, CLEANING,
YEAR
IONISATION PROBE
VISUAL INSPECTION OF THE INTEGRITY OF CERAMICS. TIP GRINDING, CHECK DISTANCE, CHECK
ELECTRICAL CONNECTION
YEAR
COMBUSTION HEAD
COMPONENTS
INTEGRITY VISUAL CHECK FOR ANY DEFORMATIONS, CLEANING,
YEAR
INSULATING GASKET
SEAL VISUAL INSPECTION AND POSSIBLE REPLACEMENT
YEAR
GAS DELIVERY COUPLING SEAL
SEAL VISUAL INSPECTION AND POSSIBLE REPLACEMENT
YEAR
AIR LINE
AIR GRILLE/DAMPERS
CLEANING
YEAR
FAN
FAN AND SCROLL CLEANING, DRIVE SHAFT GREASING
YEAR
AIR PRESSURE SWITCH
CLEANING
YEAR
AIR PRESSURE PORT AND PIPES
CLEANING
YEAR
SAFETY COMPONENTS
FLAME SENSOR
CLEANING
YEAR
GAS PRESSURE SWITCH
FUNCTIONAL INSPECTION
YEAR
VARIOUS COMPONENTS
ELECTRIC MOTORS
COOLING FAN CLEANING, BEARING NOISE CHECK
YEAR
ELECTRICAL SYSTEM
CHECK OF CONNECTIONS AND TERMINAL TIGHTENING
YEAR
FUEL LINE
GAS FILTER
REPLACING THE FILTERING ELEMENT
YEAR
HYDRAULIC/GAS SEALS
CHECK OF ANY LEAKAGES
YEAR
COMBUSTION PARAMETERS
CO CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
CO2 CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
BACHARACH SMOKE INDEX
CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
n.a.
NOX CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
IONISATION CURRENT CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
SMOKE TEMPERATURE CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
GAS PRESSURE REGULATOR
PRESSURE MEASURED AT START-UP
YEAR
IMPORTANT
In case of heavy-duty operation or when using special fuels, the maintenance intervals must be reduced adapting them to the real
operating conditions, according to the indications of the maintenance technician.
23 / 30
0006160470_202208
ENGLISH
Summary of Contents for BTG 3,6P
Page 2: ......
Page 30: ...SCHEMI ELETTRICI 28 30 0006160470_202208 ITALIANO...
Page 32: ...30 30 0006160470_202208 ITALIANO...
Page 60: ...WIRING DIAGRAMS 28 30 0006160470_202208 ENGLISH...
Page 62: ...30 30 0006160470_202208 ENGLISH...
Page 63: ......