Anchor the head unit to the boiler door as follows:
• Position the insulating seals on the sleeve (13).
• Position the insulating seal on the sleeve (13).
•
Fasten the head unit flange (14)(15) to the boiler (19)(1) by means
of the stud bolts,washers and the nuts provided (7).
CAUTION / WARNINGS
Completely seal the space between the burner sleeve and the
hole in the refractory material inside the boiler door with sui
-
table material.
•
Fit the hub (28).
• Screw the gas lever indicator (1) and the screw on lung opposite
side (8)
• Fit the modulator (29).
• Fit the spring (27) and the gas valve control lever (12).
• Check spring correct positioning
• Make sure that throttle closing matches with the position of gas
throttle level indicator, approx. 15°.
0002950320
19
13
14
7
12
27
1
28
8
29
0002950350
0002950360
0002950420
ENGLISH
14 / 46
0006160271_202007
Summary of Contents for 18190010
Page 2: ......
Page 38: ...SCHEMI ELETTRICI ITALIANO 36 46 0006160271_202007 ...
Page 39: ...ITALIANO 37 46 0006160271_202007 ...
Page 40: ...ITALIANO 38 46 0006160271_202007 ...
Page 41: ...ITALIANO 39 46 0006160271_202007 ...
Page 42: ...ITALIANO 40 46 0006160271_202007 ...
Page 43: ...ITALIANO 41 46 0006160271_202007 ...
Page 44: ...ITALIANO 42 46 0006160271_202007 ...
Page 45: ...ITALIANO 43 46 0006160271_202007 ...
Page 46: ...ITALIANO 44 46 0006160271_202007 ...
Page 47: ...ITALIANO 45 46 0006160271_202007 ...
Page 84: ...WIRING DIAGRAMS ENGLISH 36 46 0006160271_202007 ...
Page 85: ...ENGLISH 37 46 0006160271_202007 ...
Page 86: ...ENGLISH 38 46 0006160271_202007 ...
Page 87: ...ENGLISH 39 46 0006160271_202007 ...
Page 88: ...ENGLISH 40 46 0006160271_202007 ...
Page 89: ...ENGLISH 41 46 0006160271_202007 ...
Page 90: ...ENGLISH 42 46 0006160271_202007 ...
Page 91: ...ENGLISH 43 46 0006160271_202007 ...
Page 92: ...ENGLISH 44 46 0006160271_202007 ...
Page 93: ...ENGLISH 45 46 0006160271_202007 ...
Page 95: ......