www.balluff.com
5
english
1.1
Validity
This guide describes the structure, function and setup
options of the BMP Magnetic Field Positioning System with
analog current and voltage as well as IO-Link interface. It
applies to models
BMP 01- EL1PP _ 1A- _ _ _ _ - 00 -P_ _/P _ _ -S4/P _ _ -S75
This guide is intended for qualified technical personnel.
Read this guide before installing and operating the BMP.
1.2
Symbols and conventions
Individual
instructions
are indicated by a preceding
triangle.
►
Instruction 1
Action sequences
are numbered consecutively:
1.
Instruction 1
2.
Instruction 2
Digits
without further identification are decimal numbers
(e.g. 23). Hexadecimal numbers are shown with the prefix
0x (e.g. 0x12AB).
Note, tip
This symbol indicates general notes.
1.3
Scope of delivery
– BMP Magnetic Field Positioning System
– Condensed guide
The target and mounting accessories depend
on the application and are to be ordered sepa-
rately.
1.4
Approvals and markings
UL approval
File no.
E227256
The CE Mark verifies that our products
meet the requirements of the current
EMC Directive.
The BMP meets the requirements of the following product
standard:
– EN 61326-2-3 (noise immunity and emission)
Emission tests:
– RF emission
EN 55011
Noise immunity tests:
– Static electricity (ESD)
EN 61000-4-2
Severity level 2
– Electromagnetic fields (RFI)
EN 61000-4-3
Severity level 3
– Electrical fast transients (burst)
EN 61000-4-4
Severity level 3
– Conducted interference induced by
high-frequency fields
EN 61000-4-6
Severity level 3
More detailed information on the guidelines,
approvals, and standards is included in the
declaration of conformity.
1.5
Abbreviations
IODD IO device description
PD
Process data
MDC Measurement data channel
SSC
Switching signal channel
1
Notes to the user
BMP 01- EL1PP _ 1A- _ _ _ _ -00 -P _ _ /P _ _ -S4/P _ _ -S75
Magnetic Field Positioning System
Summary of Contents for BMP 01-EL1PP 1A Series
Page 2: ...www balluff com...