Balluff BIP AD2-T017-04-BP Series User Manual Download Page 8

Establish communication

To start the calibration procedure, communication is 

established between the BIP and the calibration box.

 

Press and hold the button on the calibration box 

(5 s < t < 8 s).

A functioning communication is indicated by a slow 

flashing green LED on the calibration box.

Sequential teach-in of the curve points

The teach-in of the curve points must be 

complete and programmed in ascending order. 

It is, for example, not possible to only set 

3 points and then end the calibration procedure 

prematurely.

All curve points must be within the measuring 

range.

Once communication is established between the BIP and 

calibration box, the curve points can be taught in as 

follows:

1. 

Bring the target to the first curve point P1.

2. 

Briefly press the button on the calibration box (< 1 s).

The green LED on the calibration box flashes quickly 

and briefly to indicate success. Afterwards, the green 

LED on the calibration box will continue to flash slowly.

3. 

Position the target at the second curve point.

4. 

Briefly press the button once more.

Saving is confirmed by the green LED on the calibration 

box flashing quickly. If the distance to the previously 

programmed curve points was too small or the target 

was outside the detection range, this will be indicated 

by the red LED on the calibration box flashing quickly. 

Afterwards, the green LED continues to flash slowly.

After all 5 curve points have been saved in this way, 

communication is stopped and the green LED on the 

calibration box lights up permanently once again.

Error

If the BIP is not compatible with the calibration box or an 

error occurs while establishing communication, the green 

LED on the calibration box lights up and the red LED 

flashes for a few seconds.
If during the calibration procedure, the distance to the 

previously programmed curve point is too small or the 

target is outside the detection range, this will be detected 

and indicated by a brief and quick flashing of the red LED 

on the calibration box. The calibration procedure must be 

continued after correcting the target position.

Reset

If the calibration process is not performed completely, 

the BIP returns to the previously programmed state 

(if applicable) or delivery state after 2 minutes.
If communication has been established, a reset can be 

initiated at any point during the calibration procedure:

 

Press and hold the button on the calibration box 

(> 8 s).

All curve points are deleted and the BIP outputs its 

standard curve again.

Curves

Standard curve (typical gradient)

10V/20mA

0V/4mA

0mm

17mm

Ua / Ia

S

Programmed output gradient (examples):

–  Voltage variant (BIP 

A

D2-…)

0

10

9

5

2

1

0

17

P2

P3

P5

(mm)

Ua

S

P1

P4

7

[V]

–  Current variant (BIP 

C

D2-…)

4

20

18.4

12

7.2

5.6

0

17

P2

P3

P5

(mm)

Ia

S

P1

P4

15.2

[mA]

3

english

Operation (continued)

BIP A/CD2-T017-04-BP _ _

Inductive Positioning System

Summary of Contents for BIP AD2-T017-04-BP Series

Page 1: ...deutsch Betriebsanleitung english User s guide fran ais Notice d utilisation italiano Manuale d uso espa ol Manual de instrucciones BIP AD2 T017 04 BP_ _ BIP CD2 T017 04 BP_ _...

Page 2: ...Bestimmungsgem e Verwendung Das induktive Positionsmesssystem BIP bildet zusammen mit einer Maschinensteuerung z B SPS ein Wegmess system Es wird zu seiner Verwendung in eine Maschine oder Anlage eing...

Page 3: ...tig geerdet mit dem Schutzleiter verbunden werden Kabelverlegung Kabel zwischen BIP Steuerung und Stromversorgung nicht in der N he von Starkstromleitungen verlegen induktive Einstreuungen m glich Bes...

Page 4: ...h blinkt die gr ne LED langsam weiter Nachdem alle 5 Kurvenpunkte auf diese Weise gespeichert wurden wird die Kommunikation beendet und die gr ne LED an der Einstellbox leuchtet wieder dauerhaft Fehle...

Page 5: ...Verpolungssicher ja Ausgang BIP AD2 T017 04 BP_ _ Ausgangsspannung bei Sl Ausgangsspannung bei Se Lastwiderstand RL 0 V 10 V 5 V 2000 BIP CD2 T017 04 BP_ _ Ausgangsstrom bei Sl Ausgangsstrom bei Se La...

Page 6: ...d in the declaration of conformity Safety Intended use The BIP inductive positioning system together with a machine controller e g PLC comprises a positioning system It is intended to be installed int...

Page 7: ...controller side connected with the protective earth conductor Cable routing Do not route the cable between the BIP controller and power supply near high voltage cables inductive stray noise is possib...

Page 8: ...ng quickly Afterwards the green LED continues to flash slowly After all 5 curve points have been saved in this way communication is stopped and the green LED on the calibration box lights up permanent...

Page 9: ...otection Yes Protected against miswiring Yes Polarity reversal protected Yes Output BIP AD2 T017 04 BP_ _ Output voltage at Sl Output voltage at Se Load resistance RL 0 V 10 V 5 V 2000 BIP CD2 T017 04...

Page 10: ...nforme aux prescriptions Coupl une commande de machine p ex API le syst me de mesure de position inductif BIP constitue un syst me de mesure de d placement Il est mont dans une machine ou une installa...

Page 11: ...es Ne pas poser le c ble reliant le BIP la commande et l alimentation proximit de c bles de puissance risques de perturbations inductives Les perturbations inductives cr es par des ondes harmoniques p...

Page 12: ...D verte continue de clignoter lentement Apr s que tous les 5 points de courbe aient t enregistr s de cette mani re la communication est coup e et la LED verte du bo tier de r glage est de nouveau allu...

Page 13: ...D2 T017 04 BP_ _ Tension de sortie Sl Tension de sortie Se R sistance de charge RL 0 V 10 V 5 V 2000 BIP CD2 T017 04 BP_ _ Courant de sortie Sl Courant de sortie Se R sistance de charge RL 4 mA 20 mA...

Page 14: ...o BIP costituisce insieme a un comando macchina p es PLC un sistema di misura della corsa Per poter essere utilizzato il sistema deve essere montato su una macchina o su un impianto ed destinato all i...

Page 15: ...terra sul lato unit di comando collegata con il conduttore di protezione Posa dei cavi Non posare i cavi fra BIP unit di controllo e alimentazione elettrica in prossimit di linee ad alta tensione sono...

Page 16: ...lentamente Dopo aver salvato analogamente tutti i 5 punti di curva la comunicazione termina e il LED verde sulla scatola di regolazione torna ad accendersi in modo continuo Errore Se il BIP non compa...

Page 17: ...Uscita BIP AD2 T017 04 BP_ _ Tensione in uscita a Sl Tensione in uscita a Se Resistenza di carico RL 0 V 10 V 5 V 2000 BIP CD2 T017 04 BP_ _ Corrente in uscita a Sl Corrente in uscita a Se Resistenza...

Page 18: ...tivo BIP de medici n de posici n forma un sistema de medici n de desplazamiento junto con un control de m quina por ejemplo PLC Para utilizarlo se monta en una m quina o instalaci n y est previsto par...

Page 19: ...unidad de control conexi n al conductor protector Tendido de cables No tender cables entre el BIP el control y la alimentaci n de corriente cerca de l neas de alta tensi n posibilidad de perturbacion...

Page 20: ...nuaci n el LED verde sigue parpadeando lentamente Despu s de guardar los 5 puntos de curva de este modo la comunicaci n finaliza y el LED verde de la caja de ajuste se vuelve a iluminar constantemente...

Page 21: ...AD2 T017 04 BP_ _ Tensi n de salida con Sl Tensi n de salida con Se Resistencia de carga RL 0 V 10 V 5 V 2000 BIP CD2 T017 04 BP_ _ Corriente de salida con Sl Corriente de salida con Se Resistencia de...

Page 22: ...P BIP 16 40 5 33 7 0 5 1 5 0 0 1 4 0 05 D 4 19 4 22 30 10 9 2 4 4 18 4 17 3 0 BIP CE EMC E227256 1 BIP BIP AD2 T017 04 BP_ _ BIP CD2 T017 04 BP_ _ BIP BIP BIP PLC BALLUFF BIP BIP BIP A CD2 T017 04 BP_...

Page 23: ...uff com 2 BIP 1 mm BIP 2 D 0 5 1 3 mm D 1 0 0 25 mm 17 5 4 D BAM TG XE 020 2 DIN EN ISO 4762 M4 x 10 BIP 0 5 Nm EMC BIP BN BK BU R L BAE PD XE 005 BAE00T3 BIP 17 mm BIP BIP LED BIP LED BIP A CD2 T017...

Page 24: ...LED LED 3 4 LED LED LED 5 LED BIP LED LED LED BIP 2 8 s BIP 10V 20mA 0V 4mA 0mm 17mm Ua Ia S BIP AD2 0 10 9 5 2 1 0 17 P2 P3 P5 mm Ua S P1 P4 7 V BIP CD2 4 20 18 4 12 7 2 5 6 0 17 P2 P3 P5 mm Ia S P1...

Page 25: ...30 g 11 ms EN 60068 2 6 55 Hz 1 mm 3 30 3 UB 2 15 30 V DC Ue 24 V DC Io Ue 20 mA Ue 10 UI 75 V DC BIP AD2 T017 04 BP_ _ Sl Se RL 0 V 10 V 5 V 2000 BIP CD2 T017 04 BP_ _ Sl Se RL 4 mA 20 mA 12 mA 500 9...

Page 26: ...BIP 16 40 5 33 7 0 5 1 5 0 0 1 4 0 05 D 4 19 4 22 30 10 9 2 4 4 18 4 17 3 0 BIP CE EMC E227256 1 BIP BIP AD2 T017 04 BP_ _ BIP CD2 T017 04 BP_ _ BIP BIP BIP PLC Balluff BIP EU BIP BIP A CD2 T017 04 B...

Page 27: ...ff com 2 BIP 1 mm BIP 2 D 0 5 1 3 mm D 1 0 0 25 mm 17 5 4 D BAM TG XE 020 BIP DIN EN ISO 4762 M4 x 10 2 0 5 Nm EMC BIP BN BK BU R L BAE PD XE 005 BAE00T3 BIP 17 mm 5 BIP BIP LED BIP LED BIP A CD2 T017...

Page 28: ...LED 3 2 4 LED LED LED 5 LED BIP LED LED LED BIP 2 8 BIP 10V 20mA 0V 4mA 0mm 17mm Ua Ia S BIP AD2 0 10 9 5 2 1 0 17 P2 P3 P5 mm Ua S P1 P4 7 V BIP CD2 4 20 18 4 12 7 2 5 6 0 17 P2 P3 P5 mm Ia S P1 P4...

Page 29: ...ms EN 60068 2 6 55 Hz 1 mm 3 30 min 3 UB 2 15 30 V DC Ue 24 V DC Io Ue 20 mA Ue 10 UI 75 V DC BIP AD2 T017 04 BP_ _ Sl Se RL 0 V 10 V 5 V 2000 BIP CD2 T017 04 BP_ _ Sl Se RL 4 mA 20 mA 12 mA 500 No 9...

Page 30: ...e KY 41042 Phone 859 727 2200 Toll free 1 800 543 8390 Fax 859 727 4823 technicalsupport balluff com CN Service Center China Balluff Shanghai trading Co ltd Room 1006 Pujian Rd 145 Shanghai 200127 P R...

Reviews: