© 2018 Baker Hughes, a GE company, LLC. All rights reserved
.
Masoneilan SVI II AP Digital Positioner Quick Start Guide
=
|
53
To power up the SVI II AP:
1. Loosen the four (4) cover screws and remove the cover of the SVI II AP. Connect the
+
⁄
- terminals to the current to + and - to -. See Figure 27 on page
51.
Reinstall the cover and display.
2. Adjust current to 12 mA. On initial power up of a newly installed SVI II AP, the
positioner runs in NORMAL mode using the default instrument parameters
installed at the factory. The positioner cycles through the NORMAL cycle menu and
LCD displays the following values:
PRES: Pressure - unit of measurement and value*
SIGNAL
POS (Position)
An exclamation point (
!
) appears in the top left corner of the display window
to indicate that there is further instrument status available.
3. Proceed to Configuration and Calibration.
* For firmware version 3.2.1, the supply pressure appears on the LCD. Additionally, Stops results
and Autotune results, stay displayed until cleared.
NOTE
If the SVI II AP is specified without local pushbuttons and display,
local operation is not available. Configure and calibrate with
ValVue and a HART
®
modem.
Summary of Contents for Masoneilan SVI II AP
Page 6: ...This page intentionally left blank...
Page 10: ...This page intentionally left blank...
Page 68: ...This page intentionally left blank...
Page 90: ...2018 Baker Hughes a GE company LLC All rights reserved 90 BHGE Spare Parts...
Page 92: ...2018 Baker Hughes a GE company LLC All rights reserved 92 BHGE...
Page 94: ...This page intentionally left blank...
Page 102: ...This page intentionally left blank...
Page 105: ...This page intentionally left blank...
Page 106: ...This page intentionally left blank...
Page 107: ...This page intentionally left blank...