© 2018 Baker Hughes, a GE company, LLC. All rights reserved
.
Masoneilan SVI II AP Digital Positioner Quick Start Guide
=
|
13
Using the Quick Start Guide
The SVI II AP Quick Start Guide is intended to help experienced field personnel install, setup, and
calibrate an SVI II AP in an efficient manner. This document provides basic installation and setup
instructions and is not intended to replace the in-depth information contained in the SVI II AP In-
struction Manual, downloadable at
https://www.geoilandgas.com/file-download-search
.
If you experience problems that are not documented in this guide refer to the SVI II AP Instruction
Manual, call your local representative, or go to www.ge-energy.com/valves. Sales offices are list-
ed on the last page of this document
Compliance voltage testing is best done before installation. See “Determining an SVI Positioner
Compliance Voltage in a Control System” on page
103.
The steps necessary to complete the SVI II AP installation and software setup are outlined in
Table
1.
Table 1: SVI II AP Installation Steps
Step No.
Procedure
Reference
1
Attach mounting bracket to the
actuator.
See page
26 for rotary valve and
reciprocating valve instructions.
2
Install the SVI II AP magnetic assem-
bly (rotary valves only).
See page
26 for instructions.
3
Assemble the SVI II AP on the bracket
that is mounted to the valve actuator.
See page
26 for rotary valve and
reciprocating valve instructions.
4
Install the Remote Position Sensor, if
necessary.
See
Masoneilan Valve Solutions
Remote Position Sensor Quick
Start Guide
(GEA31195 or P/N
011525100-888-0000) for
instructions.
5
Connect the pneumatic tubing to the
SVI II AP.
See page
38 for instructions.
See“Natural Gas Supply Consid-
erations” on page
38 for notes on
naturals gas installation.
6
Connect the air supply to the SVI II AP.
See page
41 for instructions.
7
Connect the positioner to the HART
®
Control Loop segment by installing
the SVI II AP wiring.
See page
42 for instructions.
Summary of Contents for Masoneilan SVI II AP
Page 6: ...This page intentionally left blank...
Page 10: ...This page intentionally left blank...
Page 68: ...This page intentionally left blank...
Page 90: ...2018 Baker Hughes a GE company LLC All rights reserved 90 BHGE Spare Parts...
Page 92: ...2018 Baker Hughes a GE company LLC All rights reserved 92 BHGE...
Page 94: ...This page intentionally left blank...
Page 102: ...This page intentionally left blank...
Page 105: ...This page intentionally left blank...
Page 106: ...This page intentionally left blank...
Page 107: ...This page intentionally left blank...