9
Structure
2" x 3"
[5 cm x 7.6 cm]
Bath Deck
Bath Lip
Structure
2" x 3"
[5 cm x 7.6 cm]
1-6
1-6
1-7
1-7
2-5
2-5
Structure
2" x 3"
[5 cm x 7.6 cm]
Bath Deck
3
”
[7.6 cm]
INSTALLATION INSTRUCTIONS |
OWNER’S MANUAL
www.bainultra.com
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
IMPORTANT
• If the ThermoMasseur and the skirt were not ordered together, the retainer blocks will not be
on the bath. As such, leave a 1/4” (0.6 cm) between the 2” x 3” (5 cm x 7.6 cm) support structure
and the lip of the bath so that the top of the skirt may be inserted under the deck.
THERMOMASSEUR
®
INSTALLATION
1. ALCOVE INSTALLATION (BETWEEN
2 OR 3 WALLS) (cont’d)
1-6
To finish the front of the bath (with
ceramic tile or other materials),
a 2” x 3” (5 cm x 7.6 cm) structure
is necessary to support the Thermo-
Masseur
®
. Place underneath the deck
(A) or the edge of the bath (B) depend-
ing on the desired finish.
1-7
BainUltra skirt installation requires a
single 2” x 3” (5 cm x 7.6 cm) support
in the front of the ThermoMasseur. Tilt
the base of the support 3” (7.6 cm)
inwards and upwards. Place the top
of the support behind the two retainer
blocks (D) of the skirt placed under-
neath the lip of the ThermoMasseur (C).
Instructions for installing skirts and retainer
blocks (not factory-installed), can be found in
the Skirt Installation section of this manual