
12
Edge of bath
Ceramic, marble,
granit or other
Plywood
2” x 3”
structure
1
1/2
"
[3.8 cm]
OWNER’S MANUAL
| INSTALLATION INSTRUCTIONS
1 800 463.2187
Monday to Thursday from 8 a.m. to 6 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © June 2020 BainUltra Inc. All rights reserved. 45200001
THERMOMASSEUR
®
PLUMBING INSTALLATION
IMPORTANT
• The ThermoMasseur must sit entirely on its base with the lip supported by a wooden structure.
• The ThermoMasseur must be level.
• The ThermoMasseur is molded with an integrated slope towards the drain. If decking around the
ThermoMasseur is level, the bath will drain accordingly.
* See specification sheet of bath for exceptions.
1-1
Prepare the site to connect the
plumbing and turbine.
1-2
Build the (2” x 3”) wooden structure
taking into account the thickness of
the ceramic tiles and the plywood as
well as the height of the bath.
NOTE: Plan air intake for turbine.
1-3
Secure plywood into place with screws
around and above structure.
1-4
Cut inside 1 1/2” of the outside dimen-
sions of the tub.
1-5
Ensure bath is levelled and that it fits
properly in cutout.
NOTE: Protect turbine and accessories
as you insert bath.
1-6
Install desired finishing materials on
top and perimeter of tub box (ceramic-
tiles, granit, marble or other) .
1-7
Set bath back into place and conduct
plumbing and turbine connection.
NOTE
• Baths with AromaCloud
®
factory installed by BainUltra may require an additional cutout on
the deck for the AromaCloud housing. This extra cutout is required when the housing
is less than 1.5 inch from the edge of the bath.
1. DROP-IN INSTALLATION