16
OWNER’S MANUAL
| INSTALLATION INSTRUCTIONS
1 800 463.2187
Monday to Thursday from 8 a.m. to 6 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © June 2020 BainUltra Inc. All rights reserved. 45200001
2. INSTALLATION
2-5
1-1
1-2
2-6
1-1
Once floor is prepared and level and
recess is cleared around the drain,
place installation template on floor in
the chosen location.
1-2
Align the template overflow with the
floor drain and ensure that the recess
around the drain is properly measured.
1-3
Use a 3/16” bit to drill anchor screw
entry points.
2-1
Mount drain on bath. Ensure water-
tightness.
2-2
Position the bath, aligning anchor
holes with anchor screw entry points.
2-3
Connect bath drain and water supply,
and complete electrical wiring.
2-4
For Geysair-equipped baths, the Gey-
sair unit must be connected to the hot
water supply with a 3/8 male compres-
sion or 1/2” male NPT hose bibb. A
T and a valve (not supplied) must be
installed at the hot water intake.
2-5
Once the bath is in place and all con-
nections completed, secure bath in
place using washers and screws sup-
plied.
2-6
Install base.
1. BATH SITE
AMMA
®
FREESTANDING
INSTALLATION