![Baileigh Industrial 1013715 Operator'S Manual Download Page 25](http://html1.mh-extra.com/html/baileigh-industrial/1013715/1013715_operators-manual_467025025.webp)
22
22
Cutting Operation Cycle
1. Set the miter cut angle.
2. Open the vise jaws.
3. Adjust the bar stop for cutting length as needed.
4. Load and clamp the piece part.
5. Insert the yellow lock key (A) into the red power
switch.
6. Lift the red power switch (B) to turn power on to
the saw.
7. Grasp the feed handle (C).
8. Press the trigger switch (D) to start blade motor.
9. Pull down the feed handle (C) applying a steady
and constant pressure.
10. After cut-off, raise feed handle slowly.
11. Release the trigger switch (D) to stop the blade
motor.
12. Open the vise jaws.
13. Remove or advance the piece part forward for next cut.
14. To turn off machine power press down on the power switch (B).
15. To stop machine in an emergency situation, press the EMERGENCY STOP button (B).
16. Remove the yellow lock key (A) after use.
NOTICE: Do not allow the saw to slam back up to the start position. Doing so will cause
damage to the pivot block and the weight of the motor will cause damage to the gear case
adaptor over time.
The Baileigh cold saw is now ready to start work. For quality cutting and machine
performance always use the correct type of blade or disk and recommended cutting speeds.
To extend the life of a new blade or disk, the first two or three cuts must be made while
exerting a slight pressure on the piece part. This will double the normal cutting time.
A
B
D
C
Summary of Contents for 1013715
Page 17: ...14 14 OVERALL DIMENSIONS Machine Dimensions when assembled 0 I REMOVE TO LOCK...
Page 33: ...30 30 BLADE SELECTION CHART...
Page 37: ...34 34 PARTS DIAGRAM...
Page 38: ...35 35...
Page 42: ...39 39 ELECTRICAL PARTS QF KM1 FR KA1 DCPS...
Page 49: ...46 46 NOTES...
Page 50: ...47 47 NOTES...
Page 51: ...48 48 NOTES...