![Baileigh Industrial 1013715 Operator'S Manual Download Page 19](http://html1.mh-extra.com/html/baileigh-industrial/1013715/1013715_operators-manual_467025019.webp)
16
16
ASSEMBLY AND SET UP
Locate and prepare the machine for assembly.
1. Locate and remove the material stop, rubber feet, and feed handle from around the base.
2. Using proper lifting techniques lift the machine off the skid and place on a solid, level bench
capable of supporting the full weight of the machine and the material to be cut.
Install the Rubber Feet.
3. Carefully tip the machine on its side and install the four
rubber feet (I).
4. Remove the oil fill transport plug from gear
transfer case.
5. Remove the packing material (J).
6. Use a wrench to unscrew an M20x40 hex
screw from the oil fill hole (K).
WARNING:
For your own safety, DO NOT connect the machine to the
power source until the machine is completely assembled and you read and
understand the entire instruction manual.
I
J
K
Summary of Contents for 1013715
Page 17: ...14 14 OVERALL DIMENSIONS Machine Dimensions when assembled 0 I REMOVE TO LOCK...
Page 33: ...30 30 BLADE SELECTION CHART...
Page 37: ...34 34 PARTS DIAGRAM...
Page 38: ...35 35...
Page 42: ...39 39 ELECTRICAL PARTS QF KM1 FR KA1 DCPS...
Page 49: ...46 46 NOTES...
Page 50: ...47 47 NOTES...
Page 51: ...48 48 NOTES...