background image

SCOPE OF MANUAL 

 
  This manual contains information concerning the 
installation, operation and maintenance of the Model 
3000+ Micro-Chart Recorder. To ensure proper 
performance of the meter, the instructions given in this 
manual should be thoroughly understood and followed. 
 

Keep the manual in a readily accessible location for 
future reference.

 

 
  Changes and additions to the original edition of this 
manual will be covered by a "CHANGE NOTICE" 
supplied with the manual. The change notice will explain 
any changes made to the product described in this 
manual. 

 
 
 

 

MODEL 3000+ TABLE OF CONTENTS

 

 
   

Page

 

 

Page

 

 
     

 

 

   

OPERATION

 

  Unpacking and Inspection................................. 1 General 

Description................................................ 7 

 General 

Specifications ...................................... 2 Status 

Mode............................................................ 8 

   

 

 

Calibration 

Mode.................................................... 

     

INSTALLATION PROCEDURE

  

 

Error 

Screens .......................................................... 

15 

Electronics  

 

Hexadecimal Conversions...................................... 

16 

 Enclosure 

Mounting.......................................... 

Illustrated Parts List ............................................... 18 

 Wiring 

Connections .......................................... 

Troubleshooting Diagram ...................................... 

20 

 
 

 
 
 

UNPACKING &
 INSPECTION

 

 
 
  To avoid damage in transit, Eastech Badger products 
are shipped to the customer in special shipping 
containers. Upon receipt of the product, perform the 
following unpacking and inspection procedures: 
 
 

NOTE: If damage to the shipping container is evident 

upon receipt, request the carrier to be present when the 
product is unpacked.

 

 
  a. 

Carefully open the shipping container following 

any instructions that may be marked on the box. Remove 
all cushioning material surrounding the product and 
carefully lift the product from the container. 
 
 
 

 
 
 
 
 
 
 
 
 
 
 

 

 

 
 

Retain the container and all packing material for possible 

use in reshipment or storage.

 

 
 b.  Visually inspect the product and applicable 
accessories for any physical damage such as scratches, 
loose or broken parts, or any other sign of damage that 
may have occurred during shipment. 
 

  NOTE: If damage is found, request an inspection by the 
carrier's agent within 48 hours of delivery and file a claim 
with the carrier. A claim for equipment damage in transit is 
the sole responsibility of the customer. 

941072 

5

1

 

Summary of Contents for 3000+

Page 1: ...ng Diagram 20 UNPACKING INSPECTION To avoid damage in transit Eastech Badger products are shipped to the customer in special shipping containers Upon receipt of the product perform the following unpac...

Page 2: ...or pressure or temperature totalization alarm indication and is used to program the recorder through menu driven prompts RECORDING 12 inch circular chart with 24 hour 7 day or 31 day selectable chart...

Page 3: ...a window The door is provided with two lockable latches Caution should be used when mounting the enclosure so that it is not exposed to direct sunlight A sun shield is recommended to prevent the temp...

Page 4: ...e dimensions If the outdoor enclosure has the window option do not mount facing the sun or install a sun shade to prevent overheatingoftheelectronicsinsidetheenclosure WIRING CONNECTIONS 4 20 MA OUTPU...

Page 5: ...en the screws on the connectors Strip off about 1 4 inch of insulation from the wires Insert the wire into the proper connector and tighten the screw securely After connecting all of the wires to the...

Page 6: ...ow not differential DC power must be connected in series with the load as shown above DRY CONTACT RELAYS MAX LOAD 250 MA 4 20 MA OUTPUT NO C SW 1 NC NO C SW 2 NC 1 2 3 4 5 6 7 8 TB5 RELAY OUTPUTS Rela...

Page 7: ...reen informs the user of the Model of the recorder This screen will be displayed for a few seconds The next screen to be displayed is the following SOFTWARE REVISION X XX SERIAL NUMBER 12345678 This s...

Page 8: ...tion of this manual CHT This indicates that the chart has made a complete rotation and the chart needs to be changed INT Indicates a contact integrator pulse output has occurred EE EEPROM read write e...

Page 9: ...t the following screen will appear MEASUREMENTS UNITS UNIT INITIALS GPM This screen allows the user to select the engineering unit of measure for the flow rate To change the units press the UP or DOWN...

Page 10: ...1 55 POWER 1 58 POWER 1 95 POWER 1 2 POWER 3 2 POWER 5 2 POWER OPTION The linear function is used where the transmitter output is proportional to flow The 1 55 power is used with 1 2 3 24 Parshall flu...

Page 11: ...to be at the span value if the UP or DOWN arrow keys are not pressed When pressing the UP or DOWN arrow keys the display will indicate the direction of the pen movement Once the pen is positioned to s...

Page 12: ...the channels to be summed must be input to the recorder when making this adjustment For example if the input signal is 4 20 mA for 0 to 100 then 4 mA must be input to all channels to be summed to mak...

Page 13: ...t points If the High alarm is set for 60 percent and the hysteresis is 3 percent then the High alarm will trip closed at 63 percent and open at 57 percent Press the UP or DOWN arrow keys to the desire...

Page 14: ...or DOWN arrow keys to select YES or NO and press the ENTER key The following screen will appear UNIT MULTIPLIER AAA X 1 000 This screen allows the selection of the desired flow rate multiplier Press...

Page 15: ...reens appear during the chart pen adjusting procedure one of the following problems probably occurred 1 There was not a 4 20 mADC analog signal to the recorder analog channel you selected while adjust...

Page 16: ...N OF DECIMAL WHOLE NUMBER TO HEXADECIMAL NUMBER 1 Divide the decimal number by 16 Example 57420 16 3588 75 2 Multiply only the fractional part of the product by 16 to arrive at the first character in...

Page 17: ...lue of the next character Example 224 0 224 3 Multiply the previously found product by 16 Example 224 X 16 3584 4 Repeat steps 2 and 3 in a cyclical fashion until you have added the last hexadecimal c...

Page 18: ...18 INSERT DWG 600662 9999 3000 RECORDER ASSY DWG...

Page 19: ...15 SPACER 6 EA 2 0 34 400006 0025 SET SCREW 4 40 X 3 16 EA 1 0 35 524720 CHART CLAMP BODY EA 1 0 36 400006 0071 SET SCREW 5 40 X 5 16 EA 1 0 37 512610 COVER W LOGO EA 1 0 38 524743 CHART KNOB EA 1 0 3...

Page 20: ...that pen arm transport tie down is removed from unit Increase damping See IOM page 10 Ok Now CONTACT FACTORY Will pen arm move with input now CONTACT FACTORY YES GO TO NEXT PAGE Do pen arm display ag...

Page 21: ...Loop Check chart rotation speed chart knob tightness power outages motor backlash Chart turn ok CONTACT FACTORY Chart turn ok YES NO Fast Slow Not at all NO YES YES 3000 should be operating properly...

Page 22: ...CULAR PURPOSE Eastech Badger shall not be liable for any defects attributable to acts or omissions of others after shipment nor any consequential incidental or contingent damage whatsoever NUCLEAR DIS...

Reviews: