![background image](http://html1.mh-extra.com/html/backyard-products/yardline-auburn-gable/yardline-auburn-gable_manual_3364611059.webp)
57
PARTS REQUIRED:
LOFT
Locate
TP
loft joists flush to bottom of top plate and secure with 3" (7,6 cm) nails at wall studs, as shown.
1
BEGIN
BACK
WALL
Back Wall
Corner
Stud
PARTS REMOVED
FOR CLARITY
3" (7,6 cm)
Nails
TP
x2
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
TP
x11
3" (7,6 cm)
x28
2" (5,1 cm)
x2
7/16 x 23-7/8 x 44-1/4" (1,1 x 112,4 x 104 cm)
Flush
Attention:
Load not to exceed
400 lbs (181 kg) evenly
distributed across loft.
2
FINISH
You have finished installing your Loft.
Install loft panels centered over loft joists. Secure with 2" (5,1 cm) nails 8" (20,3 cm) apart.
8"
(20,3cm)
2" (5,1 cm)
Nails
Flush
Flush