
26
2" (5,1 cm)
PARTS REQUIRED (TEMPORARY):
x18
3" (7,6 cm)
x8
Use
OO
as a temporary support. Secure with two 3" screws.
Center side wall assembly on the 96" (243,8 cm) floor dimension.
Ensure 1" overlap is on bottom
BEGIN
1
First, nail lower edge of panel to floor frame using 2" nails 6" apart.
Angle nail to hit floor frame
(Fig. A)
.
2
Nail side wall bottom plate to floor using eight 3" nails.
3
FINISH
96" (243,8 cm)
3" (7,6 cm)
Screws
6"
(15,2 cm)
Nail 2" nails first.
Angle to nail into
floor frame.
2" (5,1 cm) Nail
Fig. A
3" Nails into bottom plate.
Flush
Flush
OO
x1
2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
TEMPORARY SUPPORT
OO
RIGHT SIDE WALL INSTALLATION
DOO
R
DOO
R
3" (7,6 cm)
x2
You have finished securing one side wall.