
32
PARTS REQUIRED:
DOORS
OO
Flush
against wall panels.
Center in
door opening
Fig. A
OO
Center doors in door opening as shown
(Fig. B)
.
2
Remove temporary supports and check doors open properly.
3
Screw hinge boards into wall supports and floor using ten 3" screws as shown.
3" (7,6 cm)
Screws
Fig. B
3/8"
(1 cm)
Attach temporary support
OO
as a ledger board flush under wall
panels for doors to rest on, using three 3" screws
(Fig. A)
.
3" (7,6 cm)
x13
BEGIN
1
OO
x1
1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm)