manualshive.com logo in svg
background image

16574-SB

Call Us First!

DO NOT RETURN TO STORE.

For questions on assembly or for general inquiries, you may contact us in the following ways:

Call customer service:

 1-877-743-3400

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

vis

i

t b

a

cky

ard

in

st

a

l

l

er.

co

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

ca

n

 th

f

 owc

o

de 

t

a

p

ply 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

visit us online at

help.backyardproducts.com

AVOID THE WAIT!

Submit a help request
Answers to frequently asked questions
Live chat with an agent

Содержание Yardline 16574-SB

Страница 1: ...EAM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED base...

Страница 2: ...This page intentionally left blank...

Страница 3: ...GINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Re...

Страница 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Страница 5: ...1 x 10 2 x 21 6 cm CPA x2 2 x 4 x 6 5 1 x 10 2 x 15 2 cm PVA x8 3 8 x 1 3 4 x 81 1 2 1 x 4 4 x 207 cm x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 1 x 3 x 5 2 5 x 7 6 x 12 7 cm Gauge Block for 3 4 1 9 cm m...

Страница 6: ...19 32 x 5 1 2 x 30 1 8 1 5 x 14 x 76 5 cm DHA x1 19 32 x 2 1 2 x 70 7 8 1 5 x 6 3 x 180 cm DGR x2 19 32 x 2 1 2 x 70 7 8 1 5 x 6 3 x 180 cm DGL x1 DFA 19 32 x 3 1 2 x 72 1 5 x 8 9 x 182 9 cm x1 DDA 19...

Страница 7: ...48 x 84 1 x 121 9 x 213 4 cm x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 UNIVERSAL DOOR Right Left Painted Black on Ends x1 LE...

Страница 8: ...0 3 x 121 9 cm x2 7 16 x 48 x 96 1 1 x 121 9 x 243 8 cm x2 7 16 x 48 x 71 7 8 1 1 x 121 9 x 182 6 cm x2 FLOOR PARTS NOTE Panel parts are not stamped Floor panels are 5 8 1 6 cm thick 5 8 x 23 7 8 x 96...

Страница 9: ...wn for quicker assembly Length of nail must match screw length 7 1 5 8 4 1 cm 2 5 1 cm 3 7 6 cm 3 4 1 9 cm 2 5 0 cm 1 1 2 3 8 cm 1 2 5 cm x25 x2 3 7 6 cm 2 5 1 cm Window x2 Vent with Frame x18 1 2 5 c...

Страница 10: ...INFORCED WOOD FLOOR FRAME OPTIONAL CAULK 1 Tube For windows use acrylic latex exterior caulk that is paintable TO VALIDATE YOUR WARRANTY YOU MUST USE THE FOLLOWING FOUNDATION OR FLOOR MATERIALS ADDITI...

Страница 11: ...asonry Blocks in 1 2 4 or 8 thickness Asphalt Shingles 8 Block 4 Block Gravel Gravel Do not exceed 16 4x4 Runner Shingle Shingle Maximum between leveling material locations 48 12 2x4 Treated Lumber 2...

Страница 12: ...x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7...

Страница 13: ...ame 1 Use 2 3 nails at each mark and 4 nails at seams Orient parts as shown on flat surface Measure and mark BEGIN You have finished your floor frame Proceed to level and square frame FINISH Flush Flu...

Страница 14: ...ately 193 1 2 491 5 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the frame t...

Страница 15: ...se pre painted grid lines to nail into joists under panel Ensure your floor frame is square by installing one panel and squaring frame PARTS REQUIRED x1 x219 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm 2 5 1...

Страница 16: ...lk line or use pre painted grid lines on panel for 2 nails spaced 6 apart on edges and 12 apart inside panels 4 FLOOR PANELS Flush 6 15 2 cm 12 30 5 cm Flush Flush Flush Flush 2 5 1 cm 5 8 x 23 7 8 x...

Страница 17: ...stalling floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over...

Страница 18: ...CPA is 35 3 16 at both ends for squareness BEGIN 1 Secure 1 CPA flush to the floor deck with 2 3 screws Measure over 96 3 4 and install a second CPA flush to the floor deck CPA will overhang the floo...

Страница 19: ...ep 1 to assemble two more rafters with only 1 gusset Remove CPA s from floor Flip rafters over and install a second gusset with 12 2 nails No need to use jig for this gusset 3 4 2 Keep ASA firm agains...

Страница 20: ...GABLE DOOR WALL BEGIN 1 Use 2 3 nails at each mark Orient parts on edge on floor Measure and mark 89 226 1 cm 64 162 6 cm 77 1 4 196 2 cm 80 203 2 cm 68 1 2 174 cm 44 1 2 113 cm 20 1 2 52 1 cm 11 3 4...

Страница 21: ...peat Step 2 to install the right 48 x 84 panel 2 You have finished building your gable door wall FINISH Install all panels with the primed side facing up 48 x 84 121 9 x 213 4 cm x1 LEFT 1 RIGHT Maint...

Страница 22: ...his instruction show the door as a left hand swing If you install the door as a right hand swing simply mirror the left hand door instructions OPTION 1 DOOR LOCATION LEFT SIDE OF FRONT WALL IF YOU CHO...

Страница 23: ...parts on edge on floor Measure and mark BEGIN 1 Use 2 3 nails at each mark Repeat Step 1 to build second window frame 2 You have finished your window frame assemblies FINISH 4 Fig A 80 203 2 cm TK 3 7...

Страница 24: ...x 96 5 1 x 10 2 x 243 8 cm TP x7 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK x2 2 x 4 x 20 5 1 x 10 2 x 50 8 cm ABA x2 2 x 4 x 8 1 2 5 1 x 10 2 x 21 6 cm CPA 156 396 2 cm 168 426 7 cm 35 88 9 cm 144 365 8 cm...

Страница 25: ...132 3 4 304 8 cm 12 30 5 cm 32 81 3 cm QT 3 7 6 cm Nails 3 7 6 cm Nails Two nails at each location YFA TK TK Window Frame Assemblies Install QT first 2 Place Sub Assembly in frame as shown Measure an...

Страница 26: ...13 4 cm Place 48 x 84 window panel onto wall frame flush to top of frame as shown Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel with 2 nails spaced 6 apart on edges and...

Страница 27: ...ll frame flush to top of frame as shown Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel with 2 nails spaced 6 apart on edges 2 3 4 GAUGE BLOCK GAA 3 4 1 9 cm 6 15 2 cm Fo...

Страница 28: ...e and flush to installed panels Secure panel with 2 nails spaced 6 apart on edges and 12 apart inside panel 4 5 Install ATA temporary support with 3 screws into wall frame as shown x1 3 8 x 48 x 84 1...

Страница 29: ...nt parts on edge on floor Measure and mark 80 203 2 cm TK 3 7 6 cm Nails 1 1 2 3 8 cm BEGIN 1 Use 2 3 nails at each mark Repeat Step 1 to build second window frame You have finished your window frame...

Страница 30: ...x 4 x 96 5 1 x 10 2 x 243 8 cm TP x7 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK x2 2 x 4 x 20 5 1 x 10 2 x 50 8 cm ABA x2 2 x 4 x 8 1 2 5 1 x 10 2 x 21 6 cm CPA 156 396 2 cm 168 426 7 cm 35 88 9 cm 144 365 8...

Страница 31: ...1 3 cm QT 3 7 6 cm Nails 3 7 6 cm Nails Two nails at each location YFA TK TK Window Frame Assemblies Install QT first 2 Place Sub Assembly in frame as shown Measure and mark Secure with 2 3 nails at e...

Страница 32: ...4 1 x 121 9 x 213 4 cm 3 8 x 48 x 84 1 x 121 9 x 213 4 cm Place 48 x 84 window panel onto wall frame flush to top of frame as shown Use the gauge block to mark the 3 4 measurement on the wall stud Sec...

Страница 33: ...all frame flush to top of frame as shown Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel with 2 nails spaced 6 apart on edges 2 3 4 GAUGE BLOCK GAA 3 4 1 9 cm 6 15 2 cm F...

Страница 34: ...Secure panel with 2 nails spaced 6 apart on edges and 12 apart inside panel 4 5 Install ATA temporary support with 3 screws into wall frame as shown x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm 3 8 x 48 x 84...

Страница 35: ...6 7 cm 96 243 8 cm 72 182 9 cm TK x8 TP TM TM TP HINT For easier nailing stand on frame x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x8 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK 33 x36 3 7 6 cm BEGIN 1 Orient par...

Страница 36: ...ils spaced 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever m...

Страница 37: ...side panel 5 You have finished building your back wall FINISH x2 x1 x136 BACK WALL PARTS REQUIRED 2 5 1 cm 3 4 GAUGE BLOCK GAA 48 x 84 121 9 x 213 4 cm 23 7 8 x 84 60 6 x 213 4 cm For squareness maint...

Страница 38: ...cm Fig A 89 76 2 cm 44 1 2 113 cm 44 1 2 113 cm 3 7 6 cm 2 Nails at each end Temporary support x2 19 32 x 5 1 2 x 30 1 8 1 5 x 14 x 76 5 cm DHA Temporary support x2 2 x 4 x 6 5 1 x 10 2 x 15 2 cm PVA...

Страница 39: ...o TK with 1 1 2 nails Place 48 x 84 panel on frame flush at top and with a 1 3 4 gap along right side Maintain 1 3 4 measurement along edge For squareness maintain flush and 1 3 4 measurement along pa...

Страница 40: ...t 48 x 84 panel flush to left panel 3 3 1 2 8 9 cm You have finished building your gable end wall FINISH Carefully flip the gable wall over Remove temporary supports 48 x 84 121 9 x 213 4 cm x1 Flush...

Страница 41: ...have finished standing your front wall FINISH 3 7 6 cm x18 3 7 6 cm x2 x28 FRONT WALL 3 7 6 cm Nails BEGIN Center wall on the 168 426 7 cm floor dimension Use OO as a temporary brace Secure with 2 3...

Страница 42: ...your gable end wall FINISH Secure gable end wall to floor with 3 nails Fig C Nail gable end wall panel to front wall stud with 1 1 2 nails spaced 6 apart Fig C 2 3 6 15 2 cm Flush Fig A 2 5 1 cm Nails...

Страница 43: ...paced 6 apart Fig B ENSURE GABLE AND BACK WALL PANELS ARE FLUSH BEFORE SECURING 6 15 2 cm Fig B 1 1 2 3 8 cm Nails Fig C 3 7 6 cm Screw 3 7 6 cm Screw BE SURE TOP OF WALL FRAMES ARE FLUSH 2 7 6 cm Scr...

Страница 44: ...part Angle nail to hit floor frame Fig D 3 Secure back wall bottom plates to floor with 3 nails Fig D Remove temporary supports 3 7 6 cm x14 2 5 1 cm x30 BACK WALL 3 7 6 cm Nails You have finished sta...

Страница 45: ...8 x2 x28 1 1 2 3 8 cm PARTS REQUIRED 3 7 6 cm x4 2 5 1 cm x4 BEGIN 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush Flush Flush Move to the bottom of gable end wall and secure bottom of wall with 1 2 screw i...

Страница 46: ...t Fig E Secure gable wall to floor with 3 nails Fig E 2 5 1 cm Nails Angle nail to hit floor frame Fig F FINISH 4 3 5 3 7 6 cm Screw 1 1 2 3 8 cm Nails Fig E Secure gable door wall top plate with 3 sc...

Страница 47: ...nt gable panel as shown and secure with 1 1 2 nails as shown 1 BEGIN 2 Place right front gable panel flush to left panel Secure with 1 1 2 nails as shown Repeat steps to build a second gable unit You...

Страница 48: ...1 BEGIN Install both gable units the same on both gable walls Measure 2 9 16 down from top plate and mark at each side as shown Fig A You have finished installing your gable units FINISH 2 5 1 cm x40...

Страница 49: ...top of PT on 1 2 marks Secure PT with 6 3 nails Measure and mark back wall 2nd stud and over door crippler 1 2 down from top plates Fig A Place and hold top of TP on 1 2 marks Secure TP with 3 nails a...

Страница 50: ...mark gable wall corner studs 1 2 down from top plates Fig B Place and hold top of PT on 1 2 marks Secure PT with 6 3 nails Measure and mark TP 1 2 down from top plates at back wall 2nd stud Measure an...

Страница 51: ...talling your loft Place 7 16 x 26 5 8 x 89 loft panel centered on loft supports Slide panel into gap at gable wall Fig D Secure to loft frame with 2 nails evenly spaced Fig C 2 5 1 cm Nails ATTENTION...

Страница 52: ...2 3 screws t an angle at gable wall stud and 3 nails into eave wall stud as shown Place loft support ledger boards AED between gable wall and eave wall stud with narrow side to wall panel Fig A Secure...

Страница 53: ...wer 7 16 x 10 1 2 x 89 shelf panels centered on PT shelf supports Ensure panel is flush to gable wall studs Secure each shelf with 18 2 nails spaced evenly LEVEL 2 5 cm x36 3 Secure PT s with 3 screws...

Страница 54: ...rews Fig B Locate and secure both 1 gusset rafters 3 8 over top plate with 1 3 screw above notch Fig C NOTE Gussets face inside of shed Secure rafter to top plate with 2 3 screws above notch Fig B You...

Страница 55: ...a 3 4 1 9 cm measurement on the rafter Fig A and flush with the installed panel Fig C Secure panel with 2 2 nails in the corners Flush 3 4 1 9 cm Gauge Block Fig A Fig C 15 7 8 x 48 Two Nails Flush at...

Страница 56: ...m 12 30 5 cm Install a 15 7 8 x 23 7 8 panel flush with the installed 15 7 8 x 96 panel Fig A The panel is flush at the gable end overhang Fig B and the panel is 1 2 from outside of the end rafter Fig...

Страница 57: ...rners as shown Move up to the top of the panel and keep spacing between the center of the rafters Fig C Secure with 1 2 nail into each rafter Fig C Place a 48 x 71 7 8 upper roof panel flush with the...

Страница 58: ...nels with 2 nails spaced 6 apart on edges and 12 apart inside panel Your roof panels are now installed Repeat process to install roof panels on the opposite side 8 PARTS REQUIRED ROOF PANELS FINISH 6...

Страница 59: ...ils 3 8 x 4 3 4 x 64 1 8 x2 Left x2 Right Primed Side Down Flush Flush Approximately 12 30 5 cm Flush BEGIN 1 Secure with 1 1 2 nails spaced evenly approximately 12 30 5 cm Orient parts on floor Line...

Страница 60: ...EGIN 1 Secure with 3 screws into end rafter and spaced evenly approximately 24 61 cm Secure with 3 screws into end rafter and spaced evenly approximately 24 61 cm Repeat Steps 1 2 for opposite side Li...

Страница 61: ...gable unit in pattern shown Secure with 2 finish nails into gable unit and spaced evenly approximately 18 46 cm Secure with 2 finish nails into gable unit and spaced evenly approximately 18 20 3 cm R...

Страница 62: ...4 7 8 x 96 1 x 12 4 x 243 8 cm Flush x2 2 x 4 x 22 1 2 5 1 x 10 2 x 57 1 cm AO Place eave nailer AO between two center rafters as shown Keep AO flush to the outside edge of rafter Fig A Fig B Pre dri...

Страница 63: ...1 2 soffit board primed side down flush to gable trim unit and rafter ends Fig B Secure with 2 finish nails 2 in each rafter Repeat steps to install eave nailer and soffit boards on the opposite side...

Страница 64: ...A Flush x2 3 8 x 4 3 4 x 77 1 4 1 x 12 1 x 196 2 cm x2 3 8 x 4 3 4 x 96 1 x 12 1 x 243 8 cm Place 77 1 4 soffit board primed side down flush to gable trim unit and roof sheathing Fig A Secure with 2...

Страница 65: ...as shown Install temporary support GAA with 2 1 5 8 screws as shown HINT Look for 3 8 SPACER attached to doors OO GAA Tighten screws securely OFFSET 4 3 7 6 cm Screws Screws 1 5 8 4 1 cm Bottom edges...

Страница 66: ...our double doors Screw hinge boards into wall supports and floor with 10 3 screws as shown Make sure screws go into framing and floor Fig C D 5 3 7 6 cm Screws into the wall support and floor frame Fi...

Страница 67: ...NISH BEGIN 1 Secure door trim from inside with 3 4 screws as shown Fig A 2 Reinforce the door trim with 3 4 screws through door panel into trim Fig A Locate screws as shown Fig B Use 2 screws at seams...

Страница 68: ...with the edge of door Fig A 1 PARTS REQUIRED x12 2 5 1 cm DOUBLE DOOR STIFFENERS GABLE WALL FINISH Repeat to install door stiffener OO on right door Secure with 6 2 screws through outside trim into O...

Страница 69: ...w 1 1 2 3 8 cm x2 1 2 1 3 cm 1 1 2 3 8 cm 35 3 4 90 8 cm SIDE VIEW INSTALL ON RIGHT DOOR TOP VIEW 1 4 0 6 cm Pre drill and 1 2 1 2 cm Drill through 1 4 0 6 cm 1 2 1 3 cm Drill Bits You have finished i...

Страница 70: ...drill bit 2 BEGIN 1 LEFT DOOR Fig B Your spring bolts are now installed Fig A Flush Flush 69 175 3 cm Door Stiffener 69 175 3 cm Door Stiffener 3 8 drill for bolt 1 1 2 deep 3 8 drill for bolt 1 1 2 d...

Страница 71: ...3 Screw hinge board into wall supports and floor with 5 3 screws as shown Make sure screws go into framing and floor Fig D Fig E Measure gap Fig B between door trim and wall panel as shown Hold door...

Страница 72: ...4 1 9 cm Screws from behind 2 Screws You have finished securing your door trim FINISH BEGIN 1 Secure door trim from inside with 3 4 screws as shown Fig A 3 Reinforce the door trim with 3 4 screws thro...

Страница 73: ...erstrip and threshold FINISH Hold LRA tight against inside of door Fig D Secure LRA with 2 finish nails into right door frame as shown 2 3 Repeat Step 2 to install LRA on other side of door opening OO...

Страница 74: ...4 dril Pre drill through hole with 1 2 drill Keep drilled hole square to trim to avoid breaking edge of door stiffener You have finished installing your T handle BEGIN 1 Fig B Set Screw 1 1 2 3 8 cm...

Страница 75: ...panel and against eave wall Fig A B with 1 2 finish nail at top as shown Repeat steps to install trim to all four corners Finish securing trim flush to corners Fig B with 6 2 5 1 cm finish nails as s...

Страница 76: ...ur collar tie 1 BEGIN Position and level collar ties JF on 3rd and 5th rafters from double door wall HINT For best appearance install collar ties on rafters facing away from double door opening Secure...

Страница 77: ...1 5 8 4 1 cm x8 Caulk behind frame near edge Fig A FINISH You have finished installing your windows Fig B BEGIN 1 Center and secure windows with 1 5 8 screws as shown Ensure window is level Seal windo...

Страница 78: ...ide down Flush DHA DJA AZ x1 19 32 x 2 1 2 x 30 1 8 1 5 x 6 3 x 76 5 cm AZ 2 5 1 cm Finish Nails into wall frame 1 2 5 cm Screws BEGIN 1 x4 19 32 x 2 1 2 x 11 1 5 x 6 3 x 27 9 cm DJA x4 19 32 x 5 1 2...

Страница 79: ...il into framing You have finished installing your shutters and window trim x17 2 5 cm WINDOW TRIM cont AUA x1 19 32 x 2 1 2 x 53 5 1 x 6 3 x 134 6 cm DEA x1 19 32 x 3 1 2 x 55 5 1 x 8 9 x 139 7 cm CEN...

Страница 80: ...over double doors flush to hinge boards Secure with 2 finish nails into framing as shown Fig A x1 DFA 19 32 x 3 1 2 x 72 1 5 x 8 9 x 182 9 cm ZJ x1 19 32 x 2 1 2 x 72 3 2 x 6 3 x 182 9 cm x1 DDA 19 3...

Страница 81: ...x 6 7 16 x 5 1 2 1 5 x 17 5 x 14 cm NRA x1 19 32 x 6 7 16 x 2 1 5 x 16 4 x 5 1 cm JTA NRA JTA BEGIN 1 Center trim DDA over door flush to hinge board and ZJ Secure with 2 finish nails into framing as...

Страница 82: ...ES x18 1 2 5 cm x6 FINISH PARTS REQUIRED BEGIN 1 You have finished installing your decorative door hinges Level decorative hinges in position as shown Secure with 1 2 5 cm screws 1 2 5 cm Screws 1 2 5...

Страница 83: ...Vent with Frame Secure vent frame with 2 finish nails Fig B x2 2 5 cm 2 5 cm Nails Fig A Fig B Center vent frame over vent Ensure frame is level Seal vent trim from behind with high quality exterior g...

Страница 84: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Страница 85: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Страница 86: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Страница 87: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Страница 88: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Страница 89: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Страница 90: ...siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Sol...