background image

6

ROOF PANELS    

NOTE: Panel parts are not stamped.

Roof panels are 7/16" (1,1 cm) thick.

7/16 x 8-1/2 x 88-5/8"

(1,1 x 21,9 x 225,1 cm)

x4

7/16 x 48 x 96"

(1,1 x 121,9 x 243,8 cm)

x2

7/16 x 40-5/8 x 96"

(1,1 x 103,2 x 243,8 cm)

x2

7/16 x 40-5/8 x 48"

(1,1 x 103,2 x 121,9 cm)

x2

7/16 x 47-7/8 x 48"

(1,1 x 121,6 x 121,9 cm)

x2

WALL PANEL & DOORS PARTS LIST

x1

x1

3/8 x 23-7/8 x 84" 

(1 x 60,6 x 213,4 cm)

x2 

3/8 x 48 x 84"

(1 x 121,9 x 213,4 cm)

x9

x1

LEFT DOOR

            x1

RIGHT DOOR

x2

x2

x2

Summary of Contents for Heartland CLASSIC GENTRY GABLE 12' x 12'

Page 1: ...M AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based...

Page 2: ...This page intentionally left blank...

Page 3: ...ges 5 8 ADDITIONAL MATERIALS You will need additional materials to complete your shed See pages 3 4 for required and optional materials and quantities CONTACT OUR CUSTOMER SERVICE TEAM IF ANY PARTS AR...

Page 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Page 5: ...ic use you may want to construct a heavy duty floor frame by adding additional floor joists shown below as shaded Below is a list of additional materials not included x3 x4 x12 x16 2 x 4 x 12 5 1 x 10...

Page 6: ...erior caulk that is paintable 8 3 4 10 3 5 12x12 12x16 12x12 12x16 2 coats recommended DRIP EDGE Feet 15 ROOFING FELT Sq ft to cover 1 GALVANIZED ROOFING NAILS lbs 60 231 70 298 For roofing felt 2 5 1...

Page 7: ...cm x1 ZJ x4 3 8 x 7 7 8 x 86 3 4 1 x 20 x 220 3 cm x4 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184 8 cm x2 3 8 x 4 3 4 x 89 1 4 1 x 12 1 x 226 7 cm x2 3 8 x 4 3 4 x 89 1 4 1 x 12 1 x 226 7 cm x4 3 8 x 4 3 4 x...

Page 8: ...4 7 16 x 48 x 96 1 1 x 121 9 x 243 8 cm x2 7 16 x 40 5 8 x 96 1 1 x 103 2 x 243 8 cm x2 7 16 x 40 5 8 x 48 1 1 x 103 2 x 121 9 cm x2 7 16 x 47 7 8 x 48 1 1 x 121 6 x 121 9 cm x2 WALL PANEL DOORS PARTS...

Page 9: ...here screws are shown for quicker assembly Length of nail must match screw length VENT WINDOW and DOOR HARDWARE x2 Transom Window 3 4 1 9 cm x8 x1 64 Metal Threshold 3 4 1 9 cm x11 Bagged seperately s...

Page 10: ...oof panels are 7 16 1 1 cm thick WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 1 x 4 3 4 x 3 1 2 1 9 x 8 9 cm 2 x 4 1 1 2 x 3 1 2 3 8 x 8 9 cm 2 x 3 1 1 2 x 2 1 2 3 8 x 6 3 cm 1 x 3 3 4 x...

Page 11: ...ng approved concrete anchors fasteners not included Check local code for concrete foundation requirements 133 365 8 cm 144 365 8 cm 137 348 cm 185 469 9 cm 12 x 12 365 8 x 365 8 cm 12 x 16 304 8 x 487...

Page 12: ...ground For best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS MATERIAL REQUIRED 4 x 4 x 12 10 2 x 10 2 x 365 8 cm Treated Lumber 4 x 4 x 16 10 2 x 10 2 x...

Page 13: ...12 30 5 cm First secure at ends with one fastener Fig B Fig B 203 5 8 517 2 cm 203 5 8 517 2 cm 240 609 6 cm 240 609 6 cm LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking it is important to...

Page 14: ...necessary The floor should used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HINT EAVE WALL EAVE WALL Yo...

Page 15: ...2 CLA parts CLA Secure 1 CLA flush to the floor deck with 2 3 screws Fig A Measure over 144 3 4 367 7 cm and install a second CLA flush to the floor deck Secure with 2 3 screws Fig A 2 3 7 6 cm Screws...

Page 16: ...sets Secure the gusset to the rafters with 10 2 nails in the pattern shown Fig A Press DNB firmly against the outside of CLA s as shown Fig A and push rafters tight to the middle Rafters should touch...

Page 17: ...ge 20 Wall 06 Page 28 Build 2 eave walls 12 x 12 Wall 02 Page 20 Wall 03 Page 22 Wall 04 Page 24 Wall 05 Page 26 12 x 16 Wall 02 Page 20 Wall 03 Page 22 Wall 06 Page 28 Wall 07 Page 30 WALL INDEX 12 x...

Page 18: ...on flat surface flush in middle Center OSB on top of AM Fasten together with 3 nails in the pattern shown Your door header is now assembled FINISH OSB ASSEMBLED END VIEW BEGIN 1 AM AM 2 Flip header a...

Page 19: ...ame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Gauge Bloc...

Page 20: ...68 1 2 5 1 x 10 2 x 174 cm YFA x6 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI TP YFA YFA TP SP SP AI x6 UY x3 Flush Flush Flush Flush 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mar...

Page 21: ...RED 12 WALL 01 2 5 1 cm x156 x1 x1 6 15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO...

Page 22: ...PARTS REQUIRED x32 SP TP TP SP AI x7 1 BEGIN Arrange parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams HINT Flush Flus...

Page 23: ...wall over FINISH Flush Flush Install 1 48 x 84 panel 1 1 2 from the top plate Use a 2x4 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 2 Insta...

Page 24: ...PARTS REQUIRED x32 1 BEGIN Arrange parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams HINT x7 2 x 4 x 78 1 2 5 1 x 10 2...

Page 25: ...th 2 nails spaced 6 apart on edges and 12 inside panel 2 Install 1 48 x 84 and 2 23 7 8 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart...

Page 26: ...YFA HVC TJ AI x5 1 BEGIN Arrange parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 12 WALL 04 3 7 6 cm x24 x1 2 x 4 x 92 5 8 5...

Page 27: ...panel 1 1 2 from the top plate Use a 2x4 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 2 Install 2 48 x 84 panels flush to installed panels Lo...

Page 28: ...x 68 1 2 5 1 x 10 2 x 174 cm YFA x5 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI HVC YFA YFA YFA YFA TJ HVC AI x5 UY x3 Seam 3 7 6 cm Screws x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x1 2 x 4 x 92 5 8 5...

Page 29: ...t OO as a temporary brace Secure with with 2 3 screws Secure panel with 2 nails spaced 6 apart on edges 2x4 6 15 2 cm Flush Flush OO Temporary Brace 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw Insta...

Page 30: ...range parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 16 WALL 06 3 7 6 cm x36 PARTS REQUIRED AI x7 YFA HVC SP SP YFA TJ Seam...

Page 31: ...the wall over FINISH Install 1 48 x 84 panel 1 1 2 from the top plate Use a 2x4 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 2 Install 3 48...

Page 32: ...4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI HVC TJ YFA YFA YFA YFA SP SP AI x6 UY x3 Seam 3 7 6 cm Screws Arrange parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Head...

Page 33: ...panel as shown Ensure 64 162 8 cm door measurement Use part OO as a temporary brace Secure with with 2 3 screws Secure panel with 2 nails spaced 6 apart on edges 2x4 6 15 2 cm Flush Flush OO Temporary...

Page 34: ...TED ON 12 EAVE WALL STANDARD DOOR LOCATED ON 12 GABLE WALL The following steps show how to stand and secure your walls for a 12 x 12 shed These instructions are by default with the door on the 12 gabl...

Page 35: ...m overlap is to the top BEGIN 1 1 2 3 8 cm 3 7 6 cm Screws OO Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to floo...

Page 36: ...or frame Fig C Nail panel to 12 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 12 eave wall 04 or 05 is now installed FINISH 2 5 1 cm x27 1 1 2 3 8 cm x13 2 5 1 cm x2 PA...

Page 37: ...6 apart Angle nails into floor frame Fig C Secure wall bottom plates to floor with 3 nails Fig C 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D 6 15 2 cm Secure wall with 1 2 screw through gable wa...

Page 38: ...1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING 2 5 1 cm x18 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED S...

Page 39: ...re from top with 2 3 nails spaced every 24 Fig A Your wall doublers are now installed FINISH Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x2 2 x 4 x 48 5 1 x 1...

Page 40: ...3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm 3 7 6 cm Screws Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates...

Page 41: ...floor frame Fig C Nail panel to 12 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 16 wall 06 or 07 is now installed FINISH 2 5 1 cm x36 1 1 2 3 8 cm x13 2 5 1 cm x2 PART...

Page 42: ...SURE PANEL CORNERS ARE FLUSH BEGIN 1 2 2 5 1 cm x2 Flush 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Remove temporary brace OO from installed 16 wall Place 16 wall centered on floor 1 1 2 3 8 cm overlap...

Page 43: ...d 6 apart Your 2nd wall 06 is now installed FINISH 3 7 6 cm Nails 1 1 2 3 8 cm x13 Secure gable wall top plate with 1 3 screw at the corner at an angle as shown Fig D 5 3 Nail lower edge of wall panel...

Page 44: ...ig C Nail panels to 12 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING 2 5 1 cm x18 1 1 2...

Page 45: ...ry 24 Fig A Your wall doublers are now installed FINISH x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x4 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP DOOR Ensure all doubler s...

Page 46: ...ve the measurements shown Secure rafters with 2 3 screws angled at each end Fig A Fig B Secure rafters on opposite side 1 FINISH Your rafters are now installed BEGIN Rafter with ONE GUSSET facing inwa...

Page 47: ...le unit Place left and right panels on UV flush to middle panel Secure panel with 1 1 2 nails spaced 6 apart along edge Repeat steps to assemble the 2nd gable unit Install gable panels with the primed...

Page 48: ...ies Fig B x8 2 x 4 x 88 11 16 5 1 x 10 2 x 225 3 cm KFB x12 2 x 4 x 4 7 8 5 1 x 10 2 x 12 4 cm CLA 3 7 6 cm x56 Fig B x4 Fig A Flush Flush Flush Flush Flush 3 7 6 cm Screws Flip over the gable ladder...

Page 49: ...wn Fig E 8 7 Arrange gable and ladder assemblies as shown Fig E You will build 2 complete assemblies Fig E Flush Flush Flush Repeat steps 7 and 8 to build the 2nd gable unit FINISH You have finished b...

Page 50: ...S REQUIRED GABLE UNITS 3 7 6 cm x8 x2 Gable Units 2 5 1 cm x54 2 3 1 BEGIN Continue nailing lower edge of panels to wall doubler with 2 nails spaced 6 apart Working inside secure gable unit with 2 3 s...

Page 51: ...nits are now installed Repeat all steps to install the 2nd gable unit PARTS REQUIRED GABLE UNITS 3 7 6 cm x24 5 Secure gable unit frame to end rafter with 3 screws evenly spaced Angle screws if necces...

Page 52: ...painted grid lines facing up Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the bottom corner is flush to rafter end Fig B Move the gable until...

Page 53: ...e edge panel Fig C Secure panel with 2 2 nails in the corners Install 1 47 7 8 x 48 panel flush to installed panel and the panel flush to rafter ends Fig B Secure panel with 2 2 nails in the corners M...

Page 54: ...anels Ensure 3 4 measurement at the rafter Fig A Secure the panel to the rafter with 1 2 nail in each corner 6 Flush Flush Flush Flush 40 5 8 x 96 40 5 8 x 48 Move Gable Move Gable 3 8 1 0 cm Gable En...

Page 55: ...dge of gable frame Secure with 1 2 nail in each corner Secure all panels with 2 nails spaced 6 apart along panel edges and 12 apart inside panel Your roof panels are now installed FINISH Repeat all st...

Page 56: ...rid lines facing up Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the bottom corner is flush to rafter end Fig B Move the gable until the end r...

Page 57: ...Gable Move Rafter Two Nails 3 8 1 0 cm Fig C Flush Flush Flush 2 5 1 cm Nails 6 5 Fig D Maintain spacing between the centers of the rafters and to the outside of the gable frame Fig D Secure panels wi...

Page 58: ...ter Fig C 3 8 1 0 cm Gable End Rafter Fig C 2 5 1 cm Nails 9 Maintain spacing between the centers of the rafters Fig D Move each gable until the end rafter s edge is 3 8 from the edge of the panel Fig...

Page 59: ...Flush Flush Flush Flush 8 5 8 x 88 5 8 8 5 8 x 88 5 8 Secure all panels with 2 nails spaced 6 apart along panel edges and 12 apart inside panel Your roof panels are now installed FINISH Repeat all ste...

Page 60: ...g nails spaced evenly Repeat steps to install soffit boards on opposite side x72 2 5 1 cm 1 BEGIN You have finished installing your soffit panels FINISH Flush to gable panel 2 5 1 cm Finishing Nails F...

Page 61: ...fter and 4 at seam Angle nails at seam Fig C x4 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184 8 cm x32 2 5 1 cm 1 BEGIN You have finished installing your eave soffit panels FINISH Repeat steps to install eave s...

Page 62: ...d panel Fig A Secure with 2 finishing nails 2 in each rafter Fig B Angle nails at seams Fig C x4 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184 8 cm x44 2 5 1 cm 1 BEGIN You have finished installing your eave so...

Page 63: ...e side Your gable fascia boards are now installed FINISH PARTS REQUIRED x2 3 8 x 4 3 4 x 89 1 4 1 x 12 1 x 226 7 cm x2 3 8 x 4 3 4 x 89 1 4 1 x 12 1 x 226 7 cm Fig A Fig B Flush Flush at peak Flush wi...

Page 64: ...nails 2 in each rafter and 4 nails at seam Fig B Angle nails at seam Repeat steps to install fascia on opposite eave Your eave side fascia boards are now installed FINISH 1 BEGIN PARTS REQUIRED x4 3 8...

Page 65: ...hing nails 2 in each rafter and 4 nails at seam Fig B Angle nails at seam Repeat steps to install fascia on opposite eave Your eave side fascia boards are now installed FINISH 1 BEGIN PARTS REQUIRED x...

Page 66: ...1 5 8 4 1 cm 2 3 Attach temporary support OO with 3 screws in middle and at ends as shown Attach temporary support GAA with 2 1 5 8 screws OO GAA OFFSET 4 3 7 6 cm Screws 2 1 5 8 3 cm Screws Bottom ed...

Page 67: ...doors Screw hinge boards into wall supports and floor with 10 3 screws as shown Make sure screws go into framing and floor Fig C D 6 3 7 6 cm Screws into the wall support and floor frame Fig B SEAM F...

Page 68: ...6 cm Center metal threshold between doors secure using eleven 3 4 special coating screws Fig C 5 Your door and trim are now secured FINISH BEGIN 1 2 Secure two horizontal door rails AH with 4 3 4 scre...

Page 69: ...inside edge of door Mark center of window opening on door Position window in opening flush to bottom of window opening Center window on mark Secure with 4 screws to secure each window 2 Apply high qua...

Page 70: ...dge of door Fig A 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS FINISH Repeat steps to install OO on right door Secure with 7 2 screws through outside trim into OO Fig B 2 Fig A Center OO in door open...

Page 71: ...side of right door as shown Fig A Pre drill hole with 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit Your door is now prepared for handle insta...

Page 72: ...70 DOOR HARDWARE PARTS REQUIRED 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit x1 1 1 4 x2 Handle locking with Screws RIGHT DOOR Set Screw 1 1 4 Wood Screws Secure handle with 1 1 4 screws as shown...

Page 73: ...drill bit 2 BEGIN 1 LEFT DOOR Fig B Your spring bolts are now installed Fig A Flush Flush 69 175 3 cm Door Stiffener 69 175 3 cm Door Stiffener 3 8 drill for bolt 1 1 2 deep 3 8 drill for bolt 1 1 2 d...

Page 74: ...8 1 x 4 4 x 208 cm Fig A 82 1 2 82 1 2 81 7 8 NOTE 12 x 12 Model Shown Seam is flush Caulk seam before painting trim Flush to eave soffit Fig B Fig C Install gable end 82 1 2 corner trim flush to gab...

Page 75: ...all and then on every other rafter as shown FINISH Your collar ties are now installed 1 BEGIN 2nd 2nd 4th 4th HINT For best appearance install collar ties on back side of rafter Fig A PARTS REQUIRED C...

Page 76: ...r vents are now installed GABLE VENTS Repeat to install 2nd vent in the opposite gable x8 8 x 1 2 5 cm Pan Head Screws 8 x 1 2 5 cm Pan Head Screws Locate vent in the gable wall as shown Seal vent fro...

Page 77: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 78: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 79: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 80: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 81: ...ut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm Top of slot Weather Seal Flush 1 Nail per...

Page 82: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 83: ...100412000 4 Gable Trim RIGHT 3 8 NG 4 3 4 X 89 1 4 26 5 K 89040412100 2 Gable Trim LEFT 3 8 NG 4 3 4 X 89 1 4 26 5 K 89040412200 2 Corner Trim Eave Side 3 8 NGx1 3 4 x 81 7 8 TRIM K 81140112000 4 Corn...

Page 84: ...B siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit Thi...

Reviews: