47
Ensure gable panels are flush at peak of ladder and flush along top edge of
ladder assembly. Secure with 1-5/8" screws as shown
(Fig. E)
.
8
7
Arrange gable and ladder assemblies as shown
(Fig. E)
. You will build (2) complete assemblies.
Fig. E
Flush
Flush
Flush
Repeat steps 7 and 8 to build the 2nd gable unit.
FINISH
You have finished building (2) gable units.
PARTS REQUIRED:
GABLE UNITS
x2
Gable Assemblies
x2
Ladder Assemblies
x44
1-5/8" (4,1 cm)
1-5/8"
(4,1 cm)
Screws