background image

!

24/7 Support

help.backyardproducts.com

Business Hours

(734) 242-6900

Answers to frequently 

asked questions

Monday - Friday ........... 8:00am - 6:00pm EST

Saturday - Sunday .................................Closed

Technical assistance and 

how-to videos
Submit a help request
Request replacement parts

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

vis

i

t b

a

cky

ard

in

st

a

l

l

er.

co

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

ca

n

 th

flow

c

o

de 

t

a

p

ply 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

STOP

DO NOT RETURN

   

TO THE STORE!

If you discover missing or damaged parts,

or if you have questions about the building process,

please reach out to us directly for the fastest service.

16566

Summary of Contents for HANDY HOME PRODUCTS MAJESTIC

Page 1: ...shed JOIN OUR TEAM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he flowcode to apply t o d a y INSTALLE...

Page 2: ...This page intentionally left blank...

Page 3: ...DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended...

Page 4: ...installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surf...

Page 5: ...ific site 3 TAB SHINGLES 6 Bundles PAINT FOR SIDING 2 Gallons Use 100 acrylic latex exterior paint 2 coats recommended CAULK 3 Tubes Use acrylic latex exterior caulk that is paintable 1 GALVANIZED ROO...

Page 6: ...TRIM ZJ x2 5 8 x 2 1 2 x 72 1 6 x 6 3 x 183 cm AWR x2 2 x 3 x 41 7 8 5 x 7 6 x 106 cm x4 3 8 x 1 3 4 x 82 1 4 0 9 x 4 4 x 209 cm x2 2 x 4 x 48 3 4 5 x 10 x 124 cm AN x3 5 8 x 2 1 2 x 9 1 6 x 6 3 x 23...

Page 7: ...s are not stamped Roof panels are 7 16 1 1 cm thick 7 16 x 11 1 4 x 25 3 4 1 1 x 29 x 65 4 cm x4 7 16 x 11 1 4 x 96 1 1 x 29 x 244 cm x2 7 16 x 25 3 4 x 48 1 1 x 65 4 x 122 cm x4 7 16 x 48 x 96 1 1 x...

Page 8: ...PANEL DOORS PARTS LIST x5 3 8 x 48 x 84 1 x 122 x 213 cm x1 x1 x1 x2 x2 x1 LEFT DOOR x1 RIGHT DOOR x120 x133 x85 x110 x28 x70 DOOR HARDWARE WINDOWS VENTS RAMPS FASTENER HARDWARE BAG Shown Actual Size...

Page 9: ...the following page CONCRETE Use only wood treated for ground contact and fasteners approved for use with treated wood Always support frame seams Leveling higher than 16 not recommended LEVELING MATER...

Page 10: ...1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7...

Page 11: ...marks FLOOR FRAME Look for Stamp TREATED HINT For easier nailing stand on frame Arrange parts as shown on a flat surface Measure and mark Secure with 2 3 nails at each mark Your floor frame is now as...

Page 12: ...t will be approximately 173 1 16 440 cm When the frame is level and square secure one side of frame to the 4x4 runners with one fastener at ends of each runner Move to the opposite end of the frame Se...

Page 13: ...corners If the measurements are the same your floor frame is square The measurement will be approximately 170 1 16 440 cm Fig C PARTS REQUIRED x1 x62 5 8 x 48 x 96 1 6 x 121 9 x 243 2 cm 2 5 1 cm Flu...

Page 14: ...anel Install middle panel first Secure with 2 nails 6 spaced apart on edges and 12 apart inside panels Install last 48 x 96 panel flush to installed panel Secure with 2 nails 6 spaced apart on edges a...

Page 15: ...ure that the floor frame is level after installing floor panels Re level if necessary HINT IMPORTANT Use the floor as a stable work surface for wall construction Organize your assembly procedure durin...

Page 16: ...x4 2 x 3 x 96 5 x 7 6 x 244 cm PT x4 2 x 3 x 48 5 x 7 6 x 122 cm NK x64 3 7 6 cm SIDE WALL FRAMES FU x7 NK PT PT NK HINT For easier nailing stand on frame BEGIN 1 Secure with 2 3 nails at each mark B...

Page 17: ...urement on the wall stud Use RK as a 1 1 2 gauge block at top Secure panel with 2 2 nails in the corners Fig A Secure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel Ensure yo...

Page 18: ...l flush to installed panel Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 4 5 Go to next page to install right side wall panels x90 LEFT SIDE WALL PANELS PARTS REQUIRED 2 5 cm 2...

Page 19: ...as SPACER x1 RK Install 1 48 x 84 panel on wall frame as shown Use the gauge block to mark the 3 4 measurement on the wall stud Use RK as a 1 1 2 gauge block at top Secure the panel with 2 nails space...

Page 20: ...ge HINT Use RK as 1 1 2 gauge Install the middle 48 x 84 panel flush to installed panel Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 2 Install last 48 x 84 panel flush to inst...

Page 21: ...cm x1 RK 2 3 Secure FS first 1 from panel bottom Fasten PS flush to FS Secure with 1 1 2 nails spaced 12 apart Hold the 36 1 4 measurement Install left panel on FS and PS Secure with only 1 1 2 nails...

Page 22: ...89 5 cm x1 FS x1 5 8 x 3 x 9 1 6 x 7 6 x 23 cm EY TEMPORARY SUPPORT x15 Place PS flush to FS Hold the 74 5 8 measurement Secure with 1 1 2 nails spaced 12 apart Arrange parts on flat beneath panel as...

Page 23: ...cm 6 15 cm 1 1 2 3 8 cm BACK WALL PARTS REQUIRED 2 x 3 x 13 5 x 7 6 x 33 cm x1 RK x1 48 x 96 122 x 244 cm Flush Flush 8 Install right panel onto frame Secure with 1 1 2 nails spaced 6 apart on edges a...

Page 24: ...1 3 8 x 12 x 24 1 x 30 5 x 61 cm 1 1 2 3 8 cm 10 9 Install 2 wall panel supports RK on flat at measurements shown Secure with 3 1 1 2 nails Fig A Install left and right 12 x 24 upper gable panels flus...

Page 25: ...3 x 12 2 5 x 7 6 x 30 5 cm x1 DI 32 77 5 cm 32 77 5 cm 32 77 5 cm 32 77 5 cm 2 5 cm x6 Arrange NA and UX on flat on floor as shown Install DI on top of NA flush to top Fig A 2 1 BEGIN UX NA DI Flush...

Page 26: ...d Frame on flat with DI facing down Position Frame 9 from bottom of FW Secure frame to studs FV with 2 3 nails Fig B 2 3 1 BEGIN FW 1 1 2 3 2 cm 1 1 2 3 2 cm 1 1 2 3 2 cm FV FV 9 23 cm 10 23 cm 10 23...

Page 27: ...nails Fig A Use 2 roof panels as temporary supports above frame Install FR centered as shown Secure with 2 3 screws Fig B Leave temporary supports in place until after front panels are installed Your...

Page 28: ...ARE TO PREVENT BREAKING AT CORNERS 6 15 cm Install all panels with the primed side facing up Install left panel on front wall frame as shown Secure with 1 1 2 nails spaced 6 apart Maintain 64 162 5 cm...

Page 29: ...2 nails evenly spaced Install right wall panel on front wall frame Secure with 1 1 2 nails spaced 6 apart Maintain 64 162 5 cm measurement between studs and square frame 64 162 5 cm MAINTAIN MEASUREME...

Page 30: ...re with 2 3 screws 2 BEGIN 1 Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nail into floor frame Fig A 3 Your back wall is now standing FINISH Nail 2 nails first Angle to...

Page 31: ...er corner Fig B Secure the back wall panel edge to the side wall stud with 2 nails spaced 6 apart Secure the bottom of panel with 2 nails spaced 6 apart Angle nails into floor frame Fig C 3 7 6 cm Nai...

Page 32: ...6 15 cm 6 15 cm 2 5 cm Nail Fig A Fig B 2 5 cm Nail SAME MEASUREMENT Your front wall is now installed FINISH 3 7 6 cm FRONT WALL INSTALLATION 2 5 cm 3 7 6 cm 2 Ensure the measurement between the pane...

Page 33: ...Mark x8 Measure from the top of back wall loft support to the floor Measure and mark the same measurement on the back side of side wall studs at each side as shown Install 2 loft supports TP level aga...

Page 34: ...SIDE WALL DOOR Loft Support Flush x2 x8 Install PT flush to top of loft support Fig A and level against studs and with top edge of loft support Secure PT with 2 3 nails at each stud At the door side o...

Page 35: ...Loft Support NOTE There will be a gap at the end of PT Fig A Front Wall Support Your left side shelf suports are now installed Repeat steps to install shelf framing on opposite wall FINISH Install 2nd...

Page 36: ...ll workbench support from floor Transfer that measurement and mark the same measurement on the back side of side wall studs at each side Install PT to back side of studs at marks Ensure that PT is lev...

Page 37: ...ch is now installed FINISH Insert workbench panel into the gap in back wall upright Secure with 2 nails as shown 23 7 8 61 cm Fit panel into gap Install FQ to upright and workbench as shown Secure wit...

Page 38: ...16 x 44 1 4 x 48 1 1 x 112 x 122 cm x2 x8 Install loft panels onto the 3 loft supports centered from side to side and flush with the back wall panel Fit panels into gap IMPORTANT Secure loft panels wi...

Page 39: ...e shelf panel onto the left wall shelf frame flush to shelf support and loft panel Secure with 2 nails as shown Repeat on opposite side FINISH BEGIN 1 You have finished installing your shelf panels At...

Page 40: ...wall Temporary support 2x3 96 244 cm Flush at peak x120 Repeat steps to build four more rafters Flip over rafter assembly and install 2nd gusset to back side 2 Place 2 rafter halves in the corner of...

Page 41: ...embled FINISH Secure ends of rafters with one 2 screw Into rafter ends Fig A Secure rafters to top plates with 2 3 screws at an angle Fig B Fig C Your rafters are now installed 2 Align over studs Main...

Page 42: ...1 8 5 x 10 x 150 2 cm PARTS REQUIRED OO x1 2 x 3 x 69 5 x 7 6 x 175 3 cm Temporary Straight Edge Mark a line OO OO HTA HTA 1 1 4 3 2 cm 1 1 4 3 2 cm 1 1 4 3 2 cm Arrange HTA on floor as shown Using O...

Page 43: ...4 screws from inside Install 2 screws at seam Fig B Repeat steps 2 3 to install the back trim Your gable trim is now installed 3 2 HTA x4 2 x 4 x 59 1 8 5 x 10 x 150 cm PARTS REQUIRED Pre marked Line...

Page 44: ...cm PARTS REQUIRED GABLE TRIM 1 1 4 3 2 cm x24 FINISH BEGIN Install AWR level over seam of front wall panels with 1 1 4 screws from inside as shown Repeat to install AWR on back gable 1 Your horizonta...

Page 45: ...l 1 48 x 96 panel with a 3 4 measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with 2 2 nails in the corners 1 BEGIN 2 5 cm PARTS REQUIRED ROOF PANELS 3 4 GAUGE BLOCK...

Page 46: ...e installed panels Fig G and with 1 8 at gable trim Fig H Secure the roof panel with 2 nails spaced 6 apart Install 1 upper 11 1 4 x 25 3 4 roof panel flush to the installed panel Fig G and flush at p...

Page 47: ...1 BEGIN Install and level 3 collar ties JF on first 3 rafters past door opening Do not install collar ties over loft Secure with 2 nails as shown For best appearance we recommend installing collar tie...

Page 48: ...Attention Load not to exceed 250 lbs evenly distributed across loft LOFT PANELS continued 2 5 cm Continue securing loft panels with 2 nails evenly spaced as shown FINISH BEGIN 1 Your loft panels are...

Page 49: ...5 x 10 x 244 cm TP x2 2 x 4 x 48 3 4 5 x 10 x 124 cm AN 1 1 4 3 2 cm FINISH Install soffit trim flush to side wall panels and under roof panels Fig A Secure with 1 1 4 screws Repeat steps to install s...

Page 50: ...82 1 4 trim and flush up to gable trim Fig A Secure trim with 2 finishing nails 8 per trim spaced evenly Repeat steps to install corner trim to back of shed 2 BEGIN 1 Your corner trim is now installed...

Page 51: ...OFFSET 3 7 6 cm GAA x1 1 x 3 x 5 2 5 x 7 6 x 12 7 cm OO x1 1 1 2 x 2 1 2 x 69 3 8 x 7 6 x 175 3 cm TEMPORARY SUPPORT x4 x2 Arrange parts as shown on flat surface 3 8 offset is to top Look for red rig...

Page 52: ...FINISH Your doors are now installed Secure hinge boards into wall supports and floor Secure with 10 3 screws as shown Ensure sure penetrate into framing and floor Fig C D 4 3 7 6 cm Screws into the w...

Page 53: ...door trim DOOR PARTS REQUIRED FINISH BEGIN 1 3 4 1 9 cm Two Screws Door Trim Fig A Door Panel Install 3 4 screws from inside No screws in this area of RIGHT DOOR Door hardware will be installed here l...

Page 54: ...rior grade caulk to seal window Install windows in front panel opening Ensure window are level Secure with 2 screws at top of windows Caulk behind frame near edge before installing Do not fully tighte...

Page 55: ...M Flush Flush CENTER Do not nail into window flange Inside Framing Mark Center PARTS REQUIRED WINDOWS Do not nail into window flange HINT Mark edge of window frame on ZJ ZJ 2 Center ZJ over doors Secu...

Page 56: ...l 3 EY with 2 nails into framing as shown NOTE Use marks on ZJ for locating window flange Do not nail into window flange Remove temporary screws after installing trim Mark 2 Nails from outside EY x3 C...

Page 57: ...rom inside 3 4 1 9 cm 4 5 Install ZJ centered over windows Secure with 7 2 finishing nails into framing Do not nail into window flange From inside install 3 4 screws into ZJ and outer 2 EY Do not scre...

Page 58: ...2 x 3 x 69 5 x 7 6 x 175 cm x2 2 5 cm DOOR WEATHERSTRIP OO FINISH Install OO centered vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C 2 Secure OO with 7 3...

Page 59: ...open position with bolt end 3 8 down from frame Bolt is open when loop is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 LEFT DOOR Fig B Your spring b...

Page 60: ...WALL WINDOW FRAME 2 5 cm x12 Install window frame parts LV flush along window opening cutout Secure parts LV with 2 3 nails at each connection Secure panel to window framing with 2 nails spaced 6 apa...

Page 61: ...PARTS REQUIRED Seal window with high quality exterior grade caulk before installing Fig A 2 WINDOW AND WINDOW TRIM Mark center of window frame as shown Measure over 11 3 8 and mark 1 1 4 3 2 cm Screws...

Page 62: ...nstall 2nd DT 11 3 8 28 9 cm 11 3 8 28 9 cm Fig B 2 finishing nails into wall frame CENTER OF WINDOW CENTER OF WINDOW Place the inside edge of AZ 11 3 8 apart from the center of window as shown Fig B...

Page 63: ...1 2 drill Fig B Keep drilled hole square to trim to avoid breaking edge of 2x3 Secure back plate with 1 screws and handle with 1 1 4 screws as shown You have finished installing your door handle FINIS...

Page 64: ...ng walls Mark locations for vents in side walls Caulk behind vent flange Secure with 1 2 screws Your vents are now installed x12 1 2 1 3 cm VENTS x2 8 x 16 20 3 x 35 6 cm 6 15 2 cm 3 5 7 6 12 7 cm 14...

Page 65: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 66: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 67: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 68: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 69: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Page 70: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 71: ...0 10 Frontwall Panels NG MAJESTIC RGT FRONTWALL K 96004800430 1 Frontwall Panels NG MAJESTIC LFT FRONTWALL K 96004800435 1 Backwall Panels NG MAJESTIC RGT BACKWALL K 96004800440 1 Backwall Panels NG M...

Page 72: ...B siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit Thi...