Step 5
Attach
G6 Floor Rail
to E7 Left Rear Tower Leg and E3 Left Front Tower Leg with 5/16” x 2” Lag Screws and Lock
Washers.
Attach
G8 Wall Rail
to top of E7 and E3 with 5/16” x 2” Lag Screws and Lock Washers.
Attach
G7 Floor Rail
to bottom of E7 and E3 with 5/16” x 2” Lag Screws and Lock Washers.
G8
G6
G7
E7
E3
ITEMS NEEDED
1-G6 Floor Rail
1-G8 Wall Rail
1-G7 Floor Rail
HARDWARE NEEDED
12-5/16” x 2” Lag Screws
12-Lock Washers for Bolts
PAGE 27