Step 3
Attach
G15 Floor Rail
to E1 Front Right Tower leg and H10 Floor Support with 5/16” x 2 ¾” Bolts, Lock Washers
and 7/8” Barrel Nuts and Lock Washers and to E2 Center Front Tower Legs and H10 Floor Support with 5/16” x 2 ¾”
Bolts ,Lock Washers and 7/8” Barrel Nuts and Lock Washers.
Attach
G12 Floor Rail
to E3 Left Front Tower Leg and H10 Floor Support with 5/16” x 2 ¾” Bolts, Lock Washers and
7/8” Barrel Nuts and Lock Washers and to E2 Center Front Tower Leg with 5/16” x 2” Bolts, Lock Washers and
7/8” Barrel Nuts and Lock Washers.
Attach
G10 Floor Rail
to E5 Right Rear Tower Leg and H10 Floor Support with 5/16” x 2 ¾” Bolts, Lock Washers
and 7/8” Barrel Nuts and Lock Washers and to E6 Center Rear Tower Leg and H10 Floor Support with 5/16” x 2 ¾”
Bolts, Lock Washers and 7/8” Barrel Nuts and Lock Washers.
Attach
G14 Floor Rail
to E6 Center Rear Tower Leg with 5/16” x 2” Bolts, Lock Washers and 7/8” Barrel Nuts and
Lock Washers and to E7 Left Rear Tower Leg and H10 Floor support with 5/16” x 2 ¾” Bolts, Lock Washers and
7/8” Barrel Nuts and Lock Washers.
G12
G15
G10
G14
H10
H10
E1
E2
E3
E7
E6
E5
ITEMS NEEDED
1-G15 Floor Rail
1-G12 Floor Rail
1-G10 Floor Rail
1-G14 Floor Rail
6-H10 Bottom Floor Support
HARDWARE NEEDED
12-5/16” x 2 ¾” Bolts
4-5/16” x 2” Bolts
16-5/16” x 7/8” Barrel Nuts
16-Lock Washers for Bolts
16-Lock Washers for Barrel Nuts
2” Bolts
PAGE 25
H10
G14