Step 2
( Note Position of Pilot Holes in Tower Legs )
Attach
G3 Wall Rail
to
E5 Right Rear Tower Leg, E6 Center Rear Tower Leg
and
E7 Left Rear Tower Leg
using
5/16” x 2” Bolts, Lock Washers and 7/8” Barrel Nuts and Lock Washers.
Attach G1 Base Board to E5 Right Rear Tower Leg with 5/16” x 2” Bolts, Lock Washers and 7/8” Barrel Nuts and
Lock Washers.
Attach G1 Base Board to E6 Center Rear Tower Leg and H10 Bottom Floor Support with 5/16” x 2 ¾” Bolts, Lock
Washers and 7/8” Barrel Nuts and Lock Washers.
Finish attaching G1 to E7 Left Rear Tower Leg and H10 Bottom Floor Support using 5/16” x 2 ¾” Bolts, Lock
Washers and 7/8” Barrel Nuts and Lock Washers.
G3
G1
E5
E6
E7
H10
ITEMS NEEDED
1-E5 Tower Leg
1-E6 Tower Leg
1-E7 Tower Leg
1-G3 Wall Rail
1-G1 Base Board
2-H10 Bottom Floor Support
HARDWARE NEEDED
4-5/16” x 2 ¾” Bolts
8-5/16” x 2” Bolts
12-5/16” x 7/8” Barrel Nuts
12-Lock Washers for Bolts
12-Lock Washers for Barrel Nuts
2 ¾”
2 ¾”
2”
2”
2”
2”
Pilot Holes
Pilot Holes
6 Pilot Holes
PAGE 24
7 Pilot Holes