Step 41
Attach H11 Wall Rails, noting countersunk
holes drilled at 2-1/2” from edge go towards C3
Posts. Flush H11 to outside of H9 Front Wall
Rail at top and bottom pilot drill with 3/16" bit
using holes in H11 as guides and fasten using
2-1/2” Lag Screws, Internal Tooth Lock
Washers and Flat Washers. Now level H11’s
and fasten to C1 Posts using 2-1/2” Lag
Screws, Internal Tooth Lock Washers and Flat
Washers.
STEP 42
Attach three M9 Wall
Boards to inside of H11
Wall Rails on backside of
Lower Deck using 1-1/2”
Wood Screws spacing
approximately 2” apart.
STEP 43
Attach M1 Bottom Wall Rail to C2
and C1 Posts flushing M1 to outside
of C2 Posts. Measure up 3-1/2” from
G1 Baseboard at front of Set and
mark C2 and C1 Posts. Attach M1
with mark to bottom of Rail using 2”
Wood Screws. Now measure up 24”
from G1 Baseboard and mark Post
again. Place bottom of M1 Rail with
mark and attach to C2 and C1 Posts
using 2” Wood Screws.
C1
C1
C3
C3
H11
H11
H11
H11
M9
M9
M9
1 x 3-1/2 x 25 [ 2.54 x 8.89 x 63.50 ]
H11 Wall Rail * 4 Holes * 2 Req
11/16 x 3-3/8 x 23 [ 1.74 x 8.57 x 58.42 ]
M9 Wall Board * 4 Holes * 23 Req
M1 Wall Rail * 4 Holes * 2 Req
11/16 x 3-3/8 x 57-1/2 [ 1.74 x 8.57 x 146.05 ]
5/16 X 2-1/2"
LAG
SCREW
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16" FLAT
WASHER
#8 X 2"
WOOD
SCREW
#8 X 1-1/2"
WOOD
SCREW
© Leisure Time Products Inc.
Next Generation 5007 10-0409 Version 4
Page 29
C1
C2
M1
3 ½"
24"
M1
Back
Back
Front
Meijer.com
Summary of Contents for Cedar Mountain 5007
Page 3: ...Meijer com...