STEP 13
Attach G9 Bottom Floor Joist
between G7 Baseboard and Left
G6 Baseboard and attach with four
2-1/2” Wood Screws.
Note: You must pilot drill G6 and
Center screws into G9.
STEP 14
Attach H4 Top Floor Joist between H6 Left
Floor Rail and H7 Right Floor Rail using four
2-1/2” Wood Screws. Note: Center screws
into H7.
C2
C2
C2
C1
C1
C1
C1
C3
C3
C3
C3
G1
G1
G5
H7
H7
H3
H3
H8
H4
H6
1 x 3-1/2 x 57-1/2 [ 2.54 x 8.89 x 146.05 ]
H4 Floor Joist * No Holes * 1 Req
#8 X 2-1/2"
WOOD
SCREW
© Leisure Time Products Inc.
Next Generation 5007 10-0409 Version 4
Page 17
G7
G9 Floor Joist * No Holes * 1 Req (W100048)
1 x 5-1/2 x 20 [24 x 140 x 508]
G6
G9
Meijer.com
Summary of Contents for Cedar Mountain 5007
Page 3: ...Meijer com...