STEP 19
Attach L1, four-hole Floor Boards, between Tower
Posts flushing to outside of Left and Right Floor Rail
on Top Floor and between C3 Posts on Lower Floor
flush with the Right Floor Rail. Attach using 2” Wood
Screws.
28 3/4"
STEP 18
Now at Front Floor Rail and Back Floor
Rail measure to center of Rail
approximately 28-3/4” and mark Rail.
Now attach N1, five-hole Floor Board, in
center of floor using marks to locate, and
Attach using 2” Wood Screws.
STEP 20
On Upper Floor place M3, five-hole Floor Boards,
seven on each side of N1 Center Floor Board, and
space evenly. Then attach using 2” Wood Screws.
C1
C1
C1
C1
C1
C1
C2
C2
C2
C2
C2
C3
C3
C3
H3
N1
H4
L1
L1
H7
H8
M3
M3
N1
L1
L1
L1 Floor Board * 4 Holes * 4 Req
11/16 x 4-1/2 x 39 [ 1.74 x 11.43 x 99.06 ]
11/16 x 3-3/8 x 47 [ 1.74 x 8.57 x 119.38 ]
M3 Floor Board * 5 Holes * 34 Req
N1 Floor Board * 5 Holes * 1 Req
11/16 x 2-1/2 x 47 [ 1.74 x 6.35 x 119.38 ]
#8 X 2"
WOOD
SCREW
© Leisure Time Products Inc.
Next Generation 5007 10-0409 Version 4
Page 19
Meijer.com
Summary of Contents for Cedar Mountain 5007
Page 3: ...Meijer com...