STEP 11
Attach G6 Right Baseboard on C3 Post,
flushing with G1 Baseboard, pilot drill with
3/16" bit using holes in G6 as a guide.
Attach using 2-1/2” Lag Screws, Internal
Tooth Lock Washers and Flat Washers.
STEP 12
Attach G7 Center Baseboard, 6-
hole, on Left side of C1 Post, pilot
drill with 3/16" bit using holes in G7
as a guide. Attach using 2-1/2” Lag
Screws, Internal Tooth Lock
Washers and Flat Washers.
C2
C2
C2
C2
C1
C1
C1
C1
C3
C3
C3
C3
G6
G5
G5
G6
G1
G1
G1
1 x 5-1/2 x 47 [ 2.54 x 13.97 x 119.38 ]
G6 Base Board * 4 Holes * 1 Req
1 x 5-1/2 x 45 [ 2.54 x 13.97 x 114.30 ]
G7 Base Board * 6 Holes * 1 Req
5/16 X 2-1/2"
LAG
SCREW
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16" FLAT
WASHER
© Leisure Time Products Inc.
Next Generation 5007 10-0409 Version 4
Page 16
G1
G7
Meijer.com
Summary of Contents for Cedar Mountain 5007
Page 3: ...Meijer com...