4.5.23
Fix all the anchor bolts of right post once the whole structure works well.
(25) Anchor bolts of right post
4.5.24
Assemble mechanical an�-falling locks to both sides of the front end of lower pla�orm.
(26) Mechanical an�-falling lock
21
P
it
Lift
Installation