4.5.10
Fix the pair of le� and right side beam
s
with
the
cylinder moun�ng base onto
the
upper part of le� and
right carriage by the same method of fixing lower side beams. Then both sides of lower side beams and upper side
beams are to be connected with connec�on supports by hexagon socket head bolt M24*45, flat washer and spring
washer.
(17) Connec�on support for upper and lower side beams
15
P
it
Lift
Installation
Summary of Contents for Starke 2127
Page 1: ...User Manual for Pit Lift...