5.6
Electrical specifications
5.7
To be performed by the customer
6.1.1
Do not operate the parking li� if the floor is cracked or any component is broken.
6.1.2
Do not operate the parking li� if there is any person or obstacle above or under pla�orm.
6.1.3
This equipment is designed for car parking only.
6.1.4
Safety locks shall be in good condi�on at any �me.
6.2
Parking
6.2.1
Drive car onto pla�orm un�l blocked by wheel stopper. Make sure vehicle is parked in the middle of
pla�orm, avoiding any collision with side beams or wall.
6.2.2
The parking brake shall be turned on a�er vehicle on the targeted posi�on to avoid any accidental movement.
6.3.3
Over loading is not allowed. the rated capacity of Starke 2127/2227 is 2700kg and Starke 2121/2221 is 2100kg.
Cabling prepara�on to be performed by the customer:
- Up to the main switch to be in place prior to star�ng the installa�on opera�ons
- Connec�on to the main switch during installa�on
- System func�onal check tes�ng can be performed by the electrician provided by the customer
Grounding and poten�al equaliza�on:
- To be performed by the customer compliant to local regula�ons
Connec�ons required every 10 meters
Note:
For garages with doors the door manufacturer must be consulted before the electrical feed cabling is laid.
6
Operation
6.1
General notes
Item
1
2
3
4
5
Quantity
1 piece
1 piece
Every 10 m
1 piece
Description
Power meter
Grounding and poten�al
equaliza�on compliant to local
regula�ons
Fuse protector:
3 x 16 A for 3.0 KW power pack
3 x 25 A for 5.5 KW power pack
5 x 2.5 mm², 3 N
+ PE * 220 / 380 V, 50 / 60 Hz
Grounding and poten�al
equaliza�on lead-out connec�on
Position
In the feed cable
In the feed cable
Feed cables to main switch
Recurence
1 x per
power pack
1 x per system
1 x power pack
Based on site
condi�ons
From lead-out connec�on
to system
Along pit floor edges
/ rear wall
45
Hydraulic & Electrical
Summary of Contents for Starke 2127
Page 1: ...User Manual for Pit Lift...