2.  Place housing in hole. Align junction box in the 

path of the conduit trench.

3.  Insert (4) pieces of ½” EMT conduit through the 

Stability Flange™. Hammer into substrate  until 

secure.

Leave sufficient clearance to elevate housing 

to finished grade.

4.    Raise housing on EMT to finished grade. Use a 

level  to aid in leveling housing.  

5.  When housing is level, tighten screws on 

Stability Flange™ to secure housing to EMT. 

Remove excess EMT as needed.

7.  Per DIG-IT Guide, backfill the gap between the 

bottom of housing and bottom of hole with 

sand for drainage.

Housing Installation

PROJECT:

TYPE:

Threaded Entry

Side Flats

1.  Connect branch conduit connectors (By Others) 

to the junction box using either the threaded 

conduit entries on the bottom of the junction 

box or through holes drilled into the sides of the 

junction box. 

Flush with finished grade

6.  Pull primary branch circuit wiring into junction 

box.  

8.  

For soil installation: 

Fill and tamp soil to 

the appropriate height leaving room for sod, 

pavers,  etc. to be level with the top of the 

temporary cover.

Soil installation is not drive-over rated. 

9.  

For concrete installation: 

Fill the hole around 

the fixture housing to 12” below the finished 

grade with clean fill dirt and tamp carefully to 

prevent settling of fixture. Pour concrete and 

finish as required flush with the top surface of 

the temporary cover.

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

CO

2

 SERIES

Integral - Standard/Offset Metal Halide (ES16)

Ballast Installation Instructions

Reviews: