1. Loosen three (3) captive #6-32 screws securing
cap/socket assembly with 7/64” Allen wrench.
NOTE: Only one end cap (without ACV™) is
removable.
2. Depress patented Anti-Condensation Valve™
(ACV™) to release vacuum and pull cap/socket
assembly to access. Screws will be retained in
cap.
10"
(254mm)
"A/D" CAP
3" Dia.
(76mm)
2 11/16"
(68mm)
"B"/"E" CAP
(203mm)
8"
(76mm)
3" Dia.
2 11/16"
(68mm)
"C" CAP
(178mm)
7"
(76mm)
3" Dia.
Patented 360HD™
Mounting System
"B"/"E" CAP
3"
(76mm)
1"
(25mm)
"A"/"D" CAP
3"
(76mm)
5"
(127mm)
"C" CAP
2"
(51mm)
2 11/16"
(68mm)
YOSEMITE SERIES™
Remote - Solid State LED
Standard Installation
40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS
RELEASED
11-9-17
REFERENCE
NUMBER
INS-2573-00
6. Loosen, then remove two (2) #4-40 screws from
LED module using .050” Allen wrench.
7. Carefully remove LED module from heatsink.
Do not pull on connector or wiring. Handle
with care.
5. Loosen four (4) #6-32 screws on wall wash optic
holder using 7/64” Allen wrench, then gently
pull away to remove from heatsink.
3. Carefully pull out end cap assembly. LED is still
attached to leads.
Do not pull on connector or wiring. Handle
with care.
LED and Optic Replacement
4. Detach heatsink from fixture body via quick
disconnect.
Do not pull on connector or wiring. Handle
with care.
Fragile! Do not pull on connector or wiring.
Handle with care.
8. Use small pick tool to push connector off
LED board through two small slots behind
connector. Once loose, lift connector upwards
and off board.
9. Spread thin, even layer of thermal paste on back
of new LED module. Place new LED module onto
heatsink, lining up module with holes for screws.
Tighten two (2) #4-40 screws using .050” Allen
wrench to secure LED module to heatsink.