OPEARTING MANUAL
Technische Änderungen vorbehalten
B+B Thermo-Technik GmbH | Heinrich-Hertz-Str. 4 | D-78166 Donaueschingen
0141 0315-100 24.06.2022
Fon +49 771 83160 | Fax +49 771 831650 | [email protected] | bb-sensors.com
73 / 88
Operating 81- value of the hysteresis before the algorithm takes it as a new minimum value.
M 01
Setup of the
Multidrop address
. In a
RS485
network each sensor will need a specific address. This menu item will only be
shown if a RS485 interface board is plugged in. For using the
RS422
mode, press once the down button on M01
BAUD 115.2K
Setup of the
Baud
rate
for digital data transfer
S OFF
Activating (
ON
) and Deactivating (
OFF
) of an optional Sighting Laser
[►3.3 Further Accessories
]. By pressing
Up
or
Down
a
voltage of 3 VDC will be switched to the
3V SW
connection pin on the mainboard.
Peak Picking-Function
For a detection of fast hotspots (detection time 90 µs) the averaging time must be set to 0.0 s.
You can display the process temperature TProc (with post processing) and also the current average temperature TAvg (without any post
processing) in the diagram. In this way the result and functionality of the selected post processing features can easily be traced and controlled.